9
|
Electrical installation
Installer reference guide
115
EBLA04~E23V3 + EDLA04~E23V3
Daikin Altherma 3 M
4P685228-1A – 2022.05
2
Connect the changeover to external heat source cable to the appropriate
terminals as shown in the illustration below.
A4P.X2
A4P.X1
L
N
A4P
a
X1
X2
X2M
X1
X2
180°
a
Installation of EKRP1HBAA is required.
3
Fix the cable with cable ties to the cable tie mountings.
9.2.12 To connect the power consumption digital inputs
Wires: 2 (per input signal)×0.75 mm²
Power limitation digital inputs: 12 V DC / 12 mA detection (voltage
supplied by PCB)
[9.9]
Power consumption control
.
1
Access the electrical connections. See
"9.2.1 To connect the electrical wiring
2
Connect the power consumption digital inputs cable to the appropriate
terminals as shown in the illustration below.
A8P.1
A8P.2
A8P.3
A8P.4
A8P.5
S6S (DI4)
S7S (DI3)
S8S (DI2)
S9S (DI1)
Summary of Contents for EBLA04E2V3
Page 280: ...14 14 ...
Page 281: ......
Page 282: ......
Page 283: ......
Page 284: ...4P685228 1A 2022 05 Copyright 2022 Daikin Verantwortung für Energie und Umwelt ...