Name
Spacer
(1)
Flexible
hose (2)
S-shaped
pipe (3)
Harness (4)
Clamp
(5)
Quantity
1 pc.
1 pc.
1 pc.
1 pc.
1 pc.
Shape
Name
Connecting
pipe (6)
Attachment
(7)
Seal (8)
Others
Quantity
1 pc.
1 pc.
1 pc.
Shape
Operation
•
manual
Installation
•
manual
Pay the utmost attention to the following items when conduct-
ing installation work, and recheck the items on completion of
the work.
a. Test items on completion of work
Test items
In case of failure Result
Is the air conditioner free of wiring and
connection mistakes or omissions?
Operation failure
and wire burnout
Are you sure that there is no space
between the ceiling and ceiling material?
Water leakage
Are the fi xing knobs (in two points) of
the dust box secured tightly?
Vibration, noise,
and dust
collection failure
Are the fi xed knobs (in fi ve points) of
the air fi lter secured tightly?
Vibration, noise,
and dust
collection failure
Is the fall prevention cord for the dust
box and grille hooked to the mounting
bracket?
Fall
Did you attach the EL. COMPO. BOX
lid, dust box, fl exible hose, S-shaped
pipe, suction grille, and decoration
corner covers?
Noise and dust
collection failure
Be sure to recheck the items provided in the section “SAFETY
*
PRECAUTIONS”.
b. Test items before delivery
Test items
Result
Was the test operation of the air conditioner fi nished?
Did you explain the operation method of the air condi-
tioner to the customer while showing the customer the
operation manual? *
Did you make mode settings for fi lter auto cleaning
(automatic control operation settings or timer operation
settings with an operation time zone specifi ed) and
provide information on the set mode operation of the air
conditioner to the customer?
Did you deliver the operation manual to the customer?
(Be sure to hand the customer the operation manual as
well as the installation manual.)
Did you hand the customer the connecting pipe and
attachment and ask the customer to keep them?
Point of operation explanation
*
In addition to the general usage of the air conditioner, it is
necessary to explain the descriptions of the
WARNING and
CAUTION marked items in the operation manual and have
the customer read the descriptions carefully, because these
items indicate information that, if not heeded, is likely to result in
loss of life, serious injury, or property damage.
INSTALLATION SITE
3.
This product offers selectable air outlet directions. A closure kit (an
optional accessory) is required to achieve three-way fl ow patterns.
Two-way fl ow patterns are not available to this product.
Select the installation site that meets the
3-1
following conditions with the consent of the
customer.
The surface of the ceiling is not remarkably inclined.
•
Installation and service workspace is secured (see the following
•
illustrations).
The panel indicators are seen with ease.
•
The indoor and outdoor units, power cord, transmission wiring,
•
and remote controller wiring are at least 1m away from TV or
radio sets.
(The above is for the prevention of TV and radio interference.
Depending on the incoming signal strength, a distance of 1 meter
may not be suffi cient to eliminate noise.)
Required installation space.
3-2
Install the indoor unit according to the installation manual and the
following illustrations.
Indicator
Dust collection inlet
Front side of panel
Exhaust opening on panel
(see note 3)
Indoor unit
10°
Dust collection inlet
10°
256
Drain socket
See note 1
*At least 2,000mm
away from the wall
(see note 2)
(see note 3)
Indoor unit
Exhaust
opening on panel
Do not block
this part with
insulation
material.
Note
A space is required for dust collection with a vacuum cleaner
1.
used.
The asterisk-marked space will be at least 700mm with the air
2.
outlet closed.
Do not block the exhaust opening or periphery with insulation
3.
material. Otherwise, a malfunction may result.