7
|
Installation
Installer reference guide
86
EHYH EHYHBH/X08AF + EHYKOMB33AA
Daikin Altherma hybrid heat pump
4P355634-1F – 2020.10
In case of EHYHBX
0.0 mm
a
a
Drain pan kit
7.11 Connecting the electrical wiring
7.11.1 About connecting the electrical wiring
Before connecting the electrical wiring
Make sure:
▪
The refrigerant piping is connected and checked
▪
The water piping is connected
Typical workflow
Connecting the electrical wiring typically consists of the following stages:
1
Making sure the power supply system complies with the electrical
specifications of the heat pump.
2
Connecting the electrical wiring to the outdoor unit.
3
Connecting the electrical wiring to the indoor unit.
4
Connecting the main power supply of the indoor unit.
5
Connecting the main power supply of the gas boiler.
6
Connecting the communication cable between the gas boiler and the indoor
unit.
7
Connecting the user interface.
8
Connecting the shut–off valves.
9
Connecting the electrical meters.
10
Connecting the gas meter.
11
Connecting the domestic hot water pump.
12
Connecting the alarm output.
13
Connecting the space cooling/heating ON/OFF output.
14
Connecting the power consumption digital inputs.
15
Connecting the safety thermostat.
Summary of Contents for Altherma EVLQ05+08CA
Page 249: ......
Page 250: ......
Page 251: ......
Page 252: ...4P355634 1F 2020 10 Copyright 2013 Daikin Verantwortung f r Energie und Umwelt...