7
|
Installation
Installer reference guide
88
EHYH EHYHBH/X08AF + EHYKOMB33AA
Daikin Altherma hybrid heat pump
4P355634-1F – 2020.10
Tightening torques
Item
Tightening torque (N•m)
M4 (X1M)
1.2~1.5
M4 (earth)
7.11.4 To connect the electrical wiring to the outdoor unit
1
Remove the 2 switch box cover screws.
2
Remove the switch box cover.
2×
1
2
3
Strip insulation (20 mm) from the wires.
a
b
a
Strip wire end to this point
b
An excessive strip length may cause electrical shock or leakage
4
Open the wire clamp.
5
Connect the interconnection cable and power supply as follows:
3×
1 2 3
6
Install the switch box cover.
7.11.5 To connect the electrical wiring to the indoor unit
It is recommended to install all electrical wiring to the hydro box before installing
the boiler.
Summary of Contents for Altherma EVLQ05+08CA
Page 249: ......
Page 250: ......
Page 251: ......
Page 252: ...4P355634 1F 2020 10 Copyright 2013 Daikin Verantwortung f r Energie und Umwelt...