![background image](http://html.mh-extra.com/html/daikin/altherma-3-h-f-eavh16su18da6v/altherma-3-h-f-eavh16su18da6v_installers-reference-manual_501170176.webp)
9
|
Commissioning
Installer reference guide
176
EPGA11~ EAV23DA6V
Daikin Altherma 3 H F
4P606487-1 – 2019.12
1
Go to [A.4.3]:
Commissioning
>
UFH screed dryout
—
2
Select
Stop UFH screed dryout
.
3
Select
OK
to confirm.
Result:
The underfloor heating screed dryout is stopped.
Read out UFH screed dryout status
When the program is stopped due to an error, an operation switch-off, or a power
failure, you can read out the underfloor heating screed dryout status:
1
Go to [A.4.3]:
Commissioning
>
UFH screed dryout
>
Status
2
You can read out the value here:
Stopped at
+ the step
where the underfloor screed dryout was stopped.
—
3
Modify and restart the execution of the program
(a)
.
—
(a)
If the UFH screed dryout program was stopped due to a power failure and the
power resumes, the program will automatically restart the last implemented step.