![Daewoo Solar 420LC-V Manual Download Page 89](http://html1.mh-extra.com/html/daewoo/solar-420lc-v/solar-420lc-v_manual_3211603089.webp)
S0707260
Page 26
Swing Motor
19.
Put plungers (351), springs (355), O-rings
(488), and RO plugs (469) back in casing.
Make sure that both plungers are free to
move back and forth.
20.
Reassemble relief valves (51) by putting
rod, spring, stop and piston back together,
then turning plunger side of valve up to
reassemble valve body and all
components of piston: spring seat, spring,
bushing, retainer, O-ring and plug.
21.
Before replacing relief valves (51) in upper
valve casing (303), install backup rings
and O-rings.
IMPORTANT
Be careful not to damage the plunger
and spring seat.
Figure 45
Figure 46
Figure 47
Figure 48
Summary of Contents for Solar 420LC-V
Page 1: ...Return to Master Table of Contents 1HYDRAULICS...
Page 33: ...S0703010K Page 2 Accumulator TABLE OF CONTENTS General Description 3 Specifications 4...
Page 43: ...S0704090K Page 8 Center Joint Swivel...
Page 63: ...S0705000 Page 20 Cylinders Return to Master Table of Contents...
Page 70: ...S0707260 Page 7 Swing Motor...
Page 74: ...S0707260 Page 11 Swing Motor SPECIAL TOOLS Figure 5...
Page 91: ...S0707260 Page 28 Swing Motor...
Page 103: ...S0707365 Page 12 Travel Motor With Gearbox A6V160HD PARTS LIST Travel Motor Figure 12 HTS6331...
Page 107: ...S0707365 Page 16 Travel Motor With Gearbox A6V160HD Travel Motor Control HTS6331 Figure 14...
Page 136: ...S0707365 Page 45 Travel Motor With Gearbox A6V160HD 29 Remove gasket Figure 91 Figure 91 3061...