Page 20
Hydraulic System Troubleshooting, Testing and
Adjustment
Return to Master Table of Contents
FLOW METER AND FLOW METER KIT INSTALLATION
AND TESTING
Checking regulator and pump output, to assess the output balance between the front and rear pumps and
to verify operating adjustment of each regulator, will require installation of a flow meter.
The After Sales Service department of the nearest local Daewoo dealer can assist you with these tests or,
if you prefer carrying out your own testing, they should be able to help in putting together a hose and fitting
kit (or the required dimensions and specifications for hoses and fittings) to allow you to install a flow meter
downstream from the main pump assembly.
Installation and Testing Procedure
•
Turn off the engine and operate controls to release hydraulic pressure from the accumulator.
•
Vent the reservoir to release all pressure from the hydraulic system.
•
Remove guard panels from around the main pump assembly.
•
Disconnect the main pump discharge output line. Install the input flange of the flow meter on the
pump end of the output line.
•
Cap off the unused (input) end of the pump discharge line with a blocking flange.
•
Bolt up a pre-measured length of hydraulic hose, between the output end of the flow meter
assembly and the top of the reservoir. Use appropriate fittings and adapter flanges to guarantee
a pressure tight seal.
NOTE:
Be sure to maintain even tightening torque on all flange fittings. Use Loctite brand "PST
545" (or an alternate manufacturer’s hydraulic system joint seal) if required, to give an
airtight seal.
•
An assistant - who must remain at the operator’s control station at all times - should restart the
engine and run it long enough (at minimum RPM) to de-aerate the system and warm up the
engine and hydraulic system to operating temperature.
Record the values of all test results in three columns, comparing 1) pump pressure (from the instrument
panel display) with 2) measured flow, in gallons or liters per minute, from the installed flow.
meter. The third column of test results should provide a record of engine RPM measured during each of the
following tests - with the engine speed control dial set at maximum, the power mode selector at Power
Mode III and the work mode selector at digging mode:
•
Unloaded maximum engine speed baseline test (all controls in neutral).
•
Front pump test - operate "travel right" lever. Record values at all specified pressures.
•
Rear pump test - operate "travel left" lever. Record values at all specified pressures.
Record the values for each of the three tests (neutral, travel right and travel left) at the following pump
pressure levels, with travel speed control set at "high speed."
Engine RPM
Pressure
Flow
100 kg/sq cm (1,422 psi)
135 kg/sq cm (1,930 psi)
180 kg/sq cm (2,560 psi)
240 kg/sq cm (3,413 psi)
320 kg/sq cm (4,550 psi)*
*See Note, below
Summary of Contents for Solar 420LC-V
Page 1: ...Return to Master Table of Contents 1HYDRAULICS...
Page 33: ...S0703010K Page 2 Accumulator TABLE OF CONTENTS General Description 3 Specifications 4...
Page 43: ...S0704090K Page 8 Center Joint Swivel...
Page 63: ...S0705000 Page 20 Cylinders Return to Master Table of Contents...
Page 70: ...S0707260 Page 7 Swing Motor...
Page 74: ...S0707260 Page 11 Swing Motor SPECIAL TOOLS Figure 5...
Page 91: ...S0707260 Page 28 Swing Motor...
Page 103: ...S0707365 Page 12 Travel Motor With Gearbox A6V160HD PARTS LIST Travel Motor Figure 12 HTS6331...
Page 107: ...S0707365 Page 16 Travel Motor With Gearbox A6V160HD Travel Motor Control HTS6331 Figure 14...
Page 136: ...S0707365 Page 45 Travel Motor With Gearbox A6V160HD 29 Remove gasket Figure 91 Figure 91 3061...