Chapter 6. Manage / Configure the Switch
92
Left part of the homepage
is a function list. Users can select one of them for status monitoring or switch
configuration.
Upper part of the homepage
is the link status of the switch. Three different colors are used to show different status of
ports – Link Up, Link Down and Port Disable.
Middle part of homepage
is the main operation area for each function.
The details about management with http connection will be shown in the following sub-sections.
Summary of Contents for GSW-3208M
Page 1: ...GSW 3208M GSW 3416M GSW 3424M L2 Managed Gigabit Ethernet Switch ...
Page 2: ......
Page 6: ...Table of Contents ii ...
Page 19: ...Chapter 6 Manage Configure the Switch 19 ...
Page 146: ......
Page 147: ......
Page 148: ......