INSTRUCTION MANUAL Digital Light Engraver
2
Safety
Effective date
30.09.2013
2.3.2
Inspection of the protective devices
Planning, execution and documentation pertaining to the inspection shall be
carried out by the operator and shall take into consideration the applicable
laws and regulations. The following information specifies some of the criteria
and proposals.
Main Power Switch and EMERGENCY STOP button
Intervals
When the machine is switched on as well as every 4 years
in the scope of the electrical test in accordance with the reg-
ulations of the Employer's Liability Insurance Association
[BGV A3]
Scope
Functionality
Inspector
Operating personnel
Action to be
taken when
faults occur
• Do not switch on the machine
• Disconnect from the mains supply
• Arrange for qualified electrician to carry out maintenance
Protective cover
Intervals
When the machine is switched and before it is opened
Scope
Functionality (the machine must switch off when the protec-
tive cover is opened.)
Inspector
Operating personnel
Action to be
taken when
faults occur
• Do not switch on the machine
• Disconnect from the mains
• Arrange for qualified electrician to carry out maintenance
Protective guard (cover)
Intervals
During the commissioning and when the machine is
switched on
Scope
Visual inspection of the physical integrity
Inspector
Operating personnel
Action to be
taken when
faults occur
• Close off the danger zone
• Carry out repairs