Chapter 5: Installation
55
99-05-31
•
A 10 mm hex key
Preparing a mounting platform
1.
Referring to the drawing below, drill and tap four holes for M12 x 1.75
screws.
2.
If you require precise mounting, drill and ream two holes for M6 dowel
pins according to the drawing.
3.
If you are using a mounting plate, prepare it following the above steps.
Firmly fasten the plate to your bench, bracket or similar supporting
structure. Pin the plate if necessary.
Mounting the arm on the platform
To mount the arm on the platform:
1.
Install the dowel pins (if used).
Note: The dowel pins must be in the holes of the platform before lifting
the arm onto the platform.
2.
With a crane or at least two people, lift the arm onto the mounting
platform.
3.
Secure the arm to the platform with 4 x M12 x 1.75 x 50 mm long,
stainless steel 18-8 (A2), hex socket cap screw. A mounting kit consisting
of these fasteners and dowel pins is available from CRS.
Summary of Contents for F3
Page 1: ...F3 Robot Arm for C500C Controller User Guide UMI F3 310 ...
Page 3: ...99 05 31 iii ...
Page 4: ...iv 99 05 31 ...
Page 8: ...viii 99 05 31 ...
Page 18: ...4 F3 Robot Arm User Guide 99 05 31 ...
Page 44: ...30 F3 Robot Arm User Guide 99 05 31 ...
Page 52: ...38 F3 Robot Arm User Guide 99 05 31 Reach of F3 with servo gripper dimensions in inches mm ...
Page 70: ...56 F3 Robot Arm User Guide 99 05 31 ...
Page 92: ...78 F3 Robot Arm User Guide 99 05 31 ...
Page 98: ...84 F3 Robot Arm User Guide 99 05 31 ...
Page 112: ...98 F3 Robot Arm User Guide 99 05 31 ...
Page 114: ...100 F3 Robot Arm User Guide 99 05 31 ...
Page 116: ...102 F3 Robot Arm User Guide 99 05 31 ...
Page 126: ...112 99 05 31 ...