![CRS F3 User Manual Download Page 66](http://html1.mh-extra.com/html/crs/f3/f3_user-manual_2690999066.webp)
52
F3 Robot Arm User Guide
99-05-31
Collecting the Shipping Materials
Keep all shipping materials.
Warning! Do not use the shipping cap screws to fasten the arm in your
workcell. The cap screws used to ship the arm are 5/16 inch cap screws. They are
not adequate to fasten the arm in the workcell. Workcell fastening requires four M12 x
1.75 x 50 mm long cap screws.
1.
Replace the foam pad, four cap screws, and hex key in the crate.
2.
Replace the cover of the crate on the platform of the crate, aligning the
“A” marks.
3.
Replace the black-circled screws.
4.
Store the crate.
Summary of Contents for F3
Page 1: ...F3 Robot Arm for C500C Controller User Guide UMI F3 310 ...
Page 3: ...99 05 31 iii ...
Page 4: ...iv 99 05 31 ...
Page 8: ...viii 99 05 31 ...
Page 18: ...4 F3 Robot Arm User Guide 99 05 31 ...
Page 44: ...30 F3 Robot Arm User Guide 99 05 31 ...
Page 52: ...38 F3 Robot Arm User Guide 99 05 31 Reach of F3 with servo gripper dimensions in inches mm ...
Page 70: ...56 F3 Robot Arm User Guide 99 05 31 ...
Page 92: ...78 F3 Robot Arm User Guide 99 05 31 ...
Page 98: ...84 F3 Robot Arm User Guide 99 05 31 ...
Page 112: ...98 F3 Robot Arm User Guide 99 05 31 ...
Page 114: ...100 F3 Robot Arm User Guide 99 05 31 ...
Page 116: ...102 F3 Robot Arm User Guide 99 05 31 ...
Page 126: ...112 99 05 31 ...