Installation
WARNING:
To avoid fire, shock, or death, turn off the power at the
circuit breaker or remove the fuse and test that the power is off
before wiring!
NOTES:
l
Install and use this product in accordance with appropriate
electrical codes and regulations.
l
A licensed electrician should install this product.
l
The product should project 3-11/16 in. (93 mm) from the junction
box when installed.
l
For a Chicago plenum compliant installation, refer to the
ZUMMESH-JBOX-FMKT-CP Quick Start (8461) at
To install a ZUMMESH-JBOX:
1. Turn the power off at the circuit breaker.
NOTE:
When installing a ZUMMESH-JBOX-16A-LV-EM, ensure
that any backup power source is also off.
2. Mount the ZUMMESH-JBOX to the J-Box using the included locknut.
3. Wire the ZUMMESH-JBOX as shown in the following diagrams.
ZUMMESH-JBOX-5A-LV, ZUMMESH-JBOX-16A-LV, and
ZUMMESH-JBOX-20A-SW Wiring
2
ZUMMESH-JBOX Series
Quick Start
Zūm™ Mesh Wireless J-Box Load Controllers