Manuale di Istruzione
Instruction Manual
23/08/2018
Rev.1 EN
42
3.2
Unpacking and inspection
The unit was carefully checked both mechanically and electrically before shipment; it
should be inspected for any damage that may have occurred in transit.
NOTE:
If the shipping container or packaging material is damaged, it should be kept until the unit
has been mechanically and electrically checked.
If there is mechanical damage and/or the contents are incomplete (see the shipping list),
please notify the local CONTROLS representative.
If the shipping container is damaged or shows sign of stress, notify the carrier as well as
the CONTROLS representative. Save the shipping material for carrier’s inspection. Also
take some pictures.
Here follows the procedure for the unpacking of the equipment.
Summary of Contents for WIZARD 2 50-C13A0X
Page 2: ......
Page 118: ...Manuale di Istruzione Instruction Manual 23 08 2018 Rev 1 EN 116 Note...
Page 119: ...Manuale di Istruzioni Instruction Manual Rev 1 EN 23 08 2018 117 Note...
Page 120: ......