8
The HT-S has been designed for one-touch operation with the right hand. If possible, it should be
set up to the left and in front of the equipment under test. The equipment under test should be connected to
the HT-S and then left alone by the operator. After the operator is clear of the Tester and the equipment
under test, he should press the
RESET
Button, then the
TEST
button, with his right hand. This will allow
the greatest separation between the operator and the test being conducted.
The HT-S is designed to bleed the high voltage away after the test has concluded. In order to
ensure that any voltage present in the equipment being tested has been completely bled away, the operator
should not unplug the equipment under test from the HT-S until the front panel meter reads zero volts.
Safety Markings
Direct Current
Alternating
Current
Earth (ground)
TERMINAL
On (Power)
Off (Power)
Caution, possibility
of electric shock
Refer to instructions
High Voltage