23
Setting up the HT-S for Production Line Testing
This section describes procedures for setting the Leakage current level, Ground Continuity level,
high voltage Ramp Time, high Voltage level, and high Voltage Test Time. The HT-S is calibrated as
shown below at the factory to be usable without adjustment in the majority of applications. If the factory
settings are acceptable, you may skip this section.
Factory Settings
The unit is configured as shown when shipped from Compliance West USA as it shown it in Table
6:
Table 6. Factory Settings.
HT-4200S, HT-3000S, HT-2000S
Voltage Type:
AC
Leakage Current Level:
5 mA
High Voltage Ramp Time:
1 second
High Voltage Level:
1200 Volts
High Voltage Test Time:
2 seconds
Ground Continuity Level
1.50
Ω
HT-2800S
Voltage Type:
DC
Leakage Current Level:
2 mA
High Voltage Ramp Time:
1 second
High Voltage Level:
1700 Volts
High Voltage Test Time:
2 seconds
Ground resistance
1.50
Ω
Adjustments of the various settings are shown below.
CAUTION
High voltage is generated by the HT-S. Although the chassis of the equipment under test is
grounded by the HT-S, a risk of shock exists. Exercise care when using the HT-S.
NOTE
These adjustment procedures set the use parameters of the HT-S. They do not take the place of
the annual calibration required by the safety agencies.