7. 

Push the red 

RESET

 button and then the yellow 

TEST

 button. 

8. 

The tester should conduct a test sequence.  At test termination, the 

Ground OK

Full Voltage

Hipot 

Pass

, and Red 

RESET

 LED’s should be lit. 

Excess Leakage Performance Test 

 

1.

 

Disconnect all leads of the HT-S front panel. 

 

2.

 

Turn the 

Ground Check

 switch on the rear panel to the Off position. 

 

3.

 

Plug  the  supplied  18  AWG  GL  Test  Lead  (Alligator  Clip/Banana  Plug  ends,  black)  into  the 

RETURN

  receptacle  on  the  front  panel,  then,  clamp  with  the  green  alligator  clip  the  piece  of 

none insulated jumper wire.  

 

4.

 

Connect one end of the hookup wire to the clip of the black lead and insert the other end into one 

of  the  vertical  parallel  slots  in  the 

DEVICE

  receptacle  on  the  front  panel.   

Keep  clear  of  the 

wire while the test is in progress

 

5.

 

Push the red 

RESET

 button and then push the yellow 

TEST

 button. 

 

6. The  tester  should  conduct  a  test  sequence,  terminated  with  a  buzzer.    At  test  termination,  the 

Ground OK

Ground Open

Excess Leakage

, and red 

RESET

 LED’s should be lit. 

 

Hipot Breakdown Performance Test 

 
Note:  The following procedure tests the "Hipot Breakdown" circuit of the HT-S unit and involves 

high voltage.  The only exposed parts during this test are at ground potential.  However, the voltage inside 
the High Voltage Device socket may be as much as 2000 volts AC or 2800 volts DC or up to 3000 Volts 
AC and 4200 Volts DC for HT-4200S.  Proceed with caution. 
 

1.

 

Disconnect all leads of the HT-S front panel. 

 

2.

 

Turn the 

Ground Check

 switch on the rear panel to the Off position. 

 

3.

 

Plug  the  supplied  18  AWG  GL  Test  Lead  (Alligator 

Clip/Banana  Plug  ends,  black)  into  the 

RETURN

 

receptacle  on  the  front  panel,  then  connect  a  bent 
paper clip  (not provided)  to  the  green  alligator  clip 
on the end of the test lead.  

 

4.

 

Push  the  red 

RESET

  button,  then  the  yellow 

TEST

 

button.    After  the 

Full  Voltage

  LED  lights,  and 

before the 

Hipot Pass

 LED has lit, insert the end of 

the  paper  clip  into  one  of  the  vertical  parallel  slots 
in  the  High  Voltage  Device  receptacle  on  the  front 
panel.    Keep  fingers  away  from  the  alligator  clip 
and the bare wire. 

 

5. The  test  should  immediately  terminate  with  a  buzzer.    The 

Ground  OK

Ground  Open

Full 

Voltage

Hipot Fail

 and red 

RESET

 LED’s should be lit. 

  Note:    Depending  on  how  the  connection  between  the  High  Voltage  Test  Receptacle  and  the 

hookup  wire  is  made,  the 

Excess  Leakage

  LED  may  light,  and  in  some  instances,  the 

Ground 

OK 

LED may extinguish. 

 
Passage  of  these  tests  indicates  that  the  HT-S  tester  is  functioning  properly  and  that  it  is  safe  to 

use.    If  the  results  of  the  performance  test  are  not  in  accordance  with  the  above,  service  is  required.  
Remove the HT-S tester from service and contact Compliance West USA, Inc. for servicing information. 

Summary of Contents for HT-2000S

Page 1: ...HT S Series Dielectric Withstand Tester With Ground Continuity Check Instruction Manual for Models HT 2000S 0 2000VAC HT 2800S 0 2800VDC HT 3000S 0 2000VAC 0 2800VDC HT 4200S 0 3000VAC 0 4200VDC...

Page 2: ...2...

Page 3: ...g logic controlled circuit design and ergonomic front panel and represents the latest in high voltage production line testing To fully appreciate all the features of your new meter we suggest that you...

Page 4: ...Interface PN 00 RI 19 Interlock PN 00 XI 19 Section 3 20 Operating Instructions 20 Setting up your Tester 20 AC Line Voltage Requirements 20 Fuse Replacement 21 Initial Checkout Procedure 21 High Volt...

Page 5: ...5 Technical Assistance 30 Contact Information 30 Section 5 31 Maintenance and Calibration 31 Service Information 31 Cleaning 31 Calibration Information 31...

Page 6: ...ring the test due to low insulation resistance of the insulating material which separates the two conductors and 2 an abrupt dielectric breakdown due to electrical arcing or discharge either through t...

Page 7: ...that a low resistance ground is provided by the building wiring If the HT S is used on a high resistance grounding circuit dangerous high voltages may be present to the operator In addition the power...

Page 8: ...with his right hand This will allow the greatest separation between the operator and the test being conducted The HT S is designed to bleed the high voltage away after the test has concluded In order...

Page 9: ...emoving the Test Return Lead clip from the equipment under test and reconnecting it taking care to make a good connection The unit should then be retested If a failing result is repeated the connectio...

Page 10: ...leakage current is below the limit set by the rear panel adjustment Sporadic Leakage Current Failures If the red Excess Leakage LED light is on the buzzer sounds and the test is terminated the leakage...

Page 11: ...n a problem has been found with the insulation between primary and ground The equipment under test should be examined reworked and successfully tested before being shipped High Voltage Discharge The H...

Page 12: ...buzzer sounds and any voltage stored in the equipment being tested is bled off by a resistor bank in the HT S unit The voltage discharge progress is shown by the front panel meter Failure modes are s...

Page 13: ...ge Limit Voltage Adjust Ground Continuity Defeat Switch Ground Continuity Limit Ground Continuity Offset Tamper proof operation available by removing adjustment shafts ENVIRONMENTAL Operating Temperat...

Page 14: ...utes to become familiar with the use of its controls indicators and connectors The front panel features of the HT S are shown in Figure 1 and Figure 2 then described in Table 2 Figure 1 Front Panel Co...

Page 15: ...15 Figure 2 Front Panel Controls Indicators and Connectors for HT 4200S...

Page 16: ...ground circuit resistance is acceptable the green continuity LED will light and the test will continue If the Ground Check switch is defeated by the operator both LED s will be lit for the duration of...

Page 17: ...T S tester take a few minutes to become familiar with the use of its controls indicators and connectors The rear panel features of the HT S are shown in Figure 3 and described in Table 3 Figure 3 Rear...

Page 18: ...passed for testing of double insulated equipment and other types of equipment without a grounding pin in the line cord 9 Ground Resistance Setting Adjustment Used to adjust the Ground Continuity pass...

Page 19: ...Output Full Voltage 7 Output Excess Leakage 8 Output Hipot Pass 9 Output Hipot Fail 10 Output Any Failure 11 Output COM2 12 Common Table 4 Relay Interface Pin Configuration Interlock PN 00 XI The Saf...

Page 20: ...essories which meet the manufacturer s specifications shall be used Connect this equipment to grounded outlet only The integrity of the test system grounding is dependent on building ground If reshipm...

Page 21: ...s AC and 2800 Volts DC or up to 3000 Volts AC and 4200 Volts DC for HT 4200S generated by the HT S is exposed during this test A risk of shock exists Exercise care when using the HT S High Voltage Per...

Page 22: ...e High Voltage Device socket may be as much as 2000 volts AC or 2800 volts DC or up to 3000 Volts AC and 4200 Volts DC for HT 4200S Proceed with caution 1 Disconnect all leads of the HT S front panel...

Page 23: ...200S HT 3000S HT 2000S Voltage Type AC Leakage Current Level 5 mA High Voltage Ramp Time 1 second High Voltage Level 1200 Volts High Voltage Test Time 2 seconds Ground Continuity Level 1 50 HT 2800S V...

Page 24: ...of supply and turn the power switch to the I or ON position Push the RESET button The yellow TEST indicator should light indicating that the HT S is ready to test e Use the AC DC button to select the...

Page 25: ...reached The test can be terminated at any time by pressing the RESET button 6 Check the position of the Ground Check switch before testing Setting the Ground Check Switch This switch controls whether...

Page 26: ...t in shortcut circuit the green alligator clip end to the Ground Connector Tip connected on step 3 See Figure 6 5 For HT 4200S plug the supplied 18 AWG GL Test Lead Alligator Clip Banana Plug ends bla...

Page 27: ...sistance measurement is more than 1 50 the display will show OPEn Operation Techniques The following paragraphs describe how to operate the HT S tester Before proceeding with testing the HT S tester s...

Page 28: ...t set on the HT S unit the green Ground OK LED will light and the test will continue 5 2 Ramp the voltage at the rate set by the Ramp Time procedure o If leakage current between the AC pins of the pow...

Page 29: ...y cord and the chassis ground of the unit rises above the value set by the Leakage Limit procedure the red Excess Leakage LED will light the buzzer will sound and the test will terminate o If the leak...

Page 30: ...m Compliance West USA is available Phone 800 748 6224 Hours 8 30 AM 4 30 PM Pacific Time Also available on our web site at www compwest com Contact Compliance West USA 650 Gateway Center Way Suite D S...

Page 31: ...tion and or repair of instruments that are beyond their warranty period Contact the manufacturer for a cost quotation Ship the instrument and your remittance according to the instructions given by the...

Reviews: