
DIGITAL PowerStorm 1000 Graphics Subsystem Owner's Guide 2–1
2
Installation
2.1 Introduction
This chapter contains the procedure for installing the PowerStorm 1000 graphics
subsystem. It also contains the procedure for installing the optional Texture Memory
Modules, Image Rendering Modules, and Video Memory Module. The major topics
covered in this chapter include:
•
Unpacking the Subsystem
•
Installing the Workstation Interface Board and VGA Module
•
Connecting the Subsystem to the Workstation
•
Confirming Proper Installation
•
Installing Options