ION
®
-E Series Hardware Installation Guide
M0201AA
Page 28
© June 2017 CommScope, Inc.
Installing Subracks and PSUs in an Equipment Rack
Install SFP+ Transceivers in the OPT Cards
1
Follow the steps in
"Install the CAN and TEN Cards” on page 27
to install the OPT Card into the WCS
Subrack, as needed for this installation:
•
CAT: Slots L1 - L8
•
TEN: Slot R1
2
Use the system design to identify which OPT Card ports will be used in this system.
3
Obtain the required number of SFP+ Transceivers.
4
Slide the SFP into the OPT Card port identified in
Step 2
, and push the SFP into the Opt Card until you hear
it click into place.
UNRESOLVED:
Connect to what? R1.1 to CAN - otherwise? Cable?
Should you need to remove an SFP+ Transceiver, press down on its extraction lever, and then carefully pull
the transceiver out of the slot.
SFP+ Transceiver
Extracon lever
OPT Card Port 1