M0201AA
ION
®
-E Series Hardware Installation Guide
© June 2017 CommScope, Inc.
Page 27
Installing Subracks and PSUs in an Equipment Rack
Install the CAN and TEN Cards
1
If necessary, remove the blank faceplate(s) from the slot(s) in which the DART is to be installed.
a
Loosen the two thumb screws that secure the blank faceplate(s) to the Host Unit chassis.
b
Carefully withdraw the blank DART faceplate from the chassis.
c
Reserve the blank faceplates for future use.
2
Slide the card into the slot that it will occupy, and then push it back until its faceplate is flush against the
subrack chassis.
3
Tighten the two thumbscrews that secure the card in the subrack chassis.
4
Do not leave any unoccupied slots open; replace blank faceplates, as necessary..
5
Follow the rules listed below to install the CAN and TEN cards into the WCS-2 or WCS-4 Subrack.
Do not remove the blank faceplate from a slot in which a card will not be installed. To maximize airflow
through the WCS chassis, blank panels must be installed in all empty Card slots.
To maximize airflow through the WCS chassis, blank panels must be installed in all empty Card slots. If
additional blank faceplates are required, you can order them from CommScope (see
"Contacting DCCS
Global Technical Support” on page 126
).
Placement of cards to create a CAN
Placement of cards to create a TEN
2
Card Slot
Install this Card
Card Slot
Install this Card
L5 - L8
OPT Card
R1
OPT Card; use Port 1 to connect to the CAN
L1 - L4
1
CAT Card
L1 - L4
CAT Card
R1 - R8
RFD Card
M3
SUI Card
M3
SUI Card
M1 - M2
AUT Card (optional)
M1 - M2
AUT Card (optional)
1
Can also be used for additional OPT
Cards.
2
TENs do not support RFD Cards.
WCS-2 Subrack
L4
L3
L2
L1
M3
M2
M1
1
2
3
4
5
1
6
2
7
3
8
4
1
2
3
R4
R3
R2
R1
4
L4
L3
L2
L1
M3
M2
M1
WCS-4 Subrack
1
2
3
4
5
1
6
2
7
3
8
4
L8
L7
L6
L5
R8
R7
R6
R5
R4
R3
R2
R1
1
2
3
4