M0201AA
ION
®
-E Series Hardware Installation Guide
© June 2017 CommScope, Inc.
Page 25
Installing Subracks and PSUs in an Equipment Rack
Connect the Subrack and PSU Power and Communication Cables
1
Connect the rear-panel power, communication, and control cables as shown in the following graphic.
e-POI
WCS
PSU
To/From eNodeB
e-POI communicaons
e-POI power
Subrack ground
(required)
WCS DC power
Subrack ground
(required)
Recfier control
Subrack ground
(required)
85 to 264 Vac