Industrivej 62
DK-6740 Bramming
Denmark
Original
Revision:
2.0
IceTech R1000H
Procedures for Maintenance and Repair
Page:
9-29 of
32
Date:
24.08.18
Init:
JM
Open the side doors
[
1
]
to access the hopper doors. When doors are heated up to approx. 20°C
(68°F) loosen the 4 screws
[
2
]
on each door and remove the doors
[
3
]
.
Remove any ice buildup in the hoppers and on the grid on top of the hoppers. Blow dry the diverter and
the hoppers by using air at temperatures not higher than 40°C (104°F). When the hoppers are dry re-
install the doors.
Machine thaw up
While cleaning out the hoppers it’s recommended remove any buildup of water ice on tools, shuttles and
ejectors. This can be done by blow drying using air at temperatures not higher than 40°C (104°F).
To complete the maintenance task close the doors and reset alarms before resuming production. This
procedure is estimated to take no more than 2 hours and should be performed every 24 - 48 hours of
continuous production depending on ambient temperature and humidity.
1
3
2
2
Summary of Contents for 514635
Page 1: ...User s Manual Technical file 1 2 User s manual IceTech R1000H...
Page 2: ...User s Manual 1 User s manual IceTech R1000H...
Page 27: ...Technical file 2 User s manual IceTech R1000H...
Page 29: ...Table for mechanical maintenance 1 Technical File IceTech R1000H...
Page 33: ...Procedures for maintenance and repair 2 Technical File IceTech R1000H...
Page 66: ...Alarm list 3 Technical File IceTech R1000H...
Page 72: ...P I Diagram 4 Technical File IceTech R1000H...
Page 77: ...Assembly drawings 5 Technical File IceTech R1000H...