Installation
9711IMA-70
3-20
16.
Using a crane, or other
suitable lifting apparatus, lift
the pedestal up and onto the
mounting spider which was
installed in step 1.
NOTE: The circuit breaker panel
should be oriented to be facing
the radome entry hatch (AFT) so
that it is within easy reach for
powering the equipment OFF.
17.
Install the pedestal mounting
hardware. Apply Loctite and
tighten these bolts to torque
spec.
18.
Stow the pedestal, at zenith,
using the stow brace kit
provided with the antenna
system (refer to the stow
procedure in the maintenance
chapter of this manual.
19.
Attach two small S-hooks to
two web lifting straps.
20.
Hook the two lifting strap S-
hooks into the end of the
tubing of the left & right feed
struts.
21.
Unbolt the reflector from the
raised platform of the
Baseframe & Reflector crate.
EAR Controlled - ECCN EAR99
Summary of Contents for SEA TEL 9711IMA-70
Page 6: ...9711IMA 70 vi This Page Intentionally Left Blank EAR Controlled ECCN EAR99...
Page 10: ...9711IMA 70 Table of Contents x This Page Intentionally Left Blank EAR Controlled ECCN EAR99...
Page 14: ...Introduction 9711IMA 70 1 4 This Page Intentionally Left Blank EAR Controlled ECCN EAR99...
Page 60: ...Setup Azimuth Trim 9711IMA 70 7 2 This Page Intentionally Left Blank EAR Controlled ECCN EAR99...
Page 74: ...Setup Targeting 9711IMA 70 10 4 This Page Intentionally Left Blank EAR Controlled ECCN EAR99...
Page 124: ...Drawings 9711IMA 70 18 2 This Page Intentionally Left Blank EAR Controlled ECCN EAR99...
Page 132: ...EAR Controlled ECCN EAR99...
Page 133: ...EAR Controlled ECCN EAR99...
Page 134: ...EAR Controlled ECCN EAR99...
Page 159: ...EAR Controlled ECCN EAR99...
Page 160: ...EAR Controlled ECCN EAR99...
Page 165: ...EAR Controlled ECCN EAR99...
Page 177: ...EAR Controlled ECCN EAR99...
Page 178: ...EAR Controlled ECCN EAR99...