Installation
9711IMA-70
3-2
3.3.
Opening your crates
CAUTION: To prevent items from being lost or misplaced, do not unpack this
crate until you are ready to assemble and install the equipment.
3.3.1.
Location of Items inside the Crates
The new Packaging Strategy for 9711 systems has reduced the number of crates from 5 or 4 to only 3
crates.
If an Air conditioning unit is required it will be shipped on the Pedestal crate rather than as a separate
box. With this new strategy, all the items that are needed for assembly and installation of a major
component are now located together in the major components crate.
New packing lists for the crates make it easier to locate and unpack the items that are needed to
assemble and install the Antenna System. Crate design make it easier to unpack the items from each
crate. All bolts, mounting the equipment in the crate can be removed from the top side.
There is no
longer any need to reach under the pallet to hold nuts while the bolts are being removed!
,
3.3.2.
Base Frame and Reflector Crate
We recommend that you place the Base Frame and Reflector Crate in the area that you have chosen to
assembly each of these major components.
1.
This is the Base Frame & Reflector
crate.
2.
Remove the outer frame (top and
sides of the crate) by removing the
lag bolts (3/4” socket) around the
bottom of that secure the outer
frame to the bottom section of the
crate and lift the outer frame off.
3.
Remove the plastic covering.
Feed Assembly (some systems have multiple
feeds), Waveguide (some systems) and the
Feed Struts are hidden by the reflector in
this picture. See steps 4-6 below.
Reflector (shown in the raised position).
Base Frame
Legs, Brace, Feet and hardware
4.
Feed Struts (wrapped and tied to
the wooden diagonal).
EAR Controlled - ECCN EAR99
Summary of Contents for SEA TEL 9711IMA-70
Page 6: ...9711IMA 70 vi This Page Intentionally Left Blank EAR Controlled ECCN EAR99...
Page 10: ...9711IMA 70 Table of Contents x This Page Intentionally Left Blank EAR Controlled ECCN EAR99...
Page 14: ...Introduction 9711IMA 70 1 4 This Page Intentionally Left Blank EAR Controlled ECCN EAR99...
Page 60: ...Setup Azimuth Trim 9711IMA 70 7 2 This Page Intentionally Left Blank EAR Controlled ECCN EAR99...
Page 74: ...Setup Targeting 9711IMA 70 10 4 This Page Intentionally Left Blank EAR Controlled ECCN EAR99...
Page 124: ...Drawings 9711IMA 70 18 2 This Page Intentionally Left Blank EAR Controlled ECCN EAR99...
Page 132: ...EAR Controlled ECCN EAR99...
Page 133: ...EAR Controlled ECCN EAR99...
Page 134: ...EAR Controlled ECCN EAR99...
Page 159: ...EAR Controlled ECCN EAR99...
Page 160: ...EAR Controlled ECCN EAR99...
Page 165: ...EAR Controlled ECCN EAR99...
Page 177: ...EAR Controlled ECCN EAR99...
Page 178: ...EAR Controlled ECCN EAR99...