22
A:
Install toe kick by placing it against the universal brackets and
screwing through the bracket and into the toe kick using 3/4”
screws. Do this on both left and right sides accessing through
the inside of the cabinet. (Diagram 5, image 4).
TIP:
When screwing toe kick down to the universal brackets, lift
the toe kick up slightly to about 1/16” off the floor. This will allow
the bottom shelf to fit snug on top of the toe kick.
2
Diagram 3
Diagram 4
LOCKED
UNLOCKED
IMAGE 3
IMAGE 4
A:
Install top shelf and lock it in place. Next install the middle
shelf and lock it in place. (Diagram 3, 4, image 3).
TOOLS NEEDED FOR INSTALLATION
1
2
A:
When dealing with floor-mounted sections, place a level on
the floor to make sure the floor is level (Diagram 7). If not,
look for your highest side.
TOOLS NEEDED FOR INSTALLATION
TOOLS NEEDED FOR INSTALLATION
Diagram 5
Diagram 6