16
where each stud is located.
(See figure B).
FIGURE B
TIP:
If you are unable to locate any studs in the wall, or if metal
studs, go back to page 10:
Installing Snap Toggle Anchors
.
2 1/2” SUSPENSION RAIL SCREW
FIGURE C
FIGURE D
STEP 1: HANGING THE RAIL
continued
A.
Attach
suspension brackets
to panels. (There are two holes
at the top of each panel near the notch) Attach bracket
to the panel with two
13mm suspension bracket screws
using your drill with no 2 Phillips bit. Repeat step 2.A until
all suspension brackets are installed. (See figure E).
B.
Once all of the
suspension brackets
are secured to the
panels, hook them onto the rail. Lift the panel vertically
and with the suspension bracket above the rail, slowly
lower the panel so that the suspension bracket securely
hangs off the rail. (See figure F).
TIP:
Make sure the farthest left and right vertical panels
have their suspension brackets facing towards the inside of
the system. Alternate every other panel with left then right
sided suspension brackets. Hang the vertical panels on
suspension rail roughly where they will go.
13MM SUSPENSION
BRACKET SCREW
SUSPENSION
BRACKET
FIGURE E
FIGURE F
Note:
Panels are numbered and correspond to your drawings.
Each panel has a specific place. Confirm panel location with
your drawing.
STEP 2: SUSPEND THE PANELS