
181
a1) Synchronous [ f
1
= f
2
]
With this adjustment all pulse phases [f
1
, f
2
… f
n
] of the welding power
sources involved are executed synchronously.
"
Pulse generator (f
1
)" - "Pulse receiver (f
2
)" synchronous.
a2) Synchronous 1/2 [ ½ f
1
= f
2
]
With this adjustment the pulse phase [f
2
… f
n
] of the welding power
sources is synchronised with half of the pulse phase frequency of
the welding power source (f
1
). The pulse phases are synchronously
executed.
"
Pulse generator (f
1
)" - "Pulse receiver (f
2
)" synchronous 1/2.
b1) Alternating [f
1
= f
2
]
The pulse phases [f
2
… f
n
] of the welding power sources involved alter-
nate with the pulse generator. The phase shift is adjusted at the pulse
generator between 10 % and 90 %. The picture shows a phase shift of
50 %.
Alternately synchronised pulse mode has a mostly positive influence
on the process stability.
"Pulse generator (f
1
)" - "Pulse receiver (f
2
)" alternating.
b2) Alternating 1/2 [ ½ f
1
= f
2
]
With this adjustment the pulse phases [f
2
… f
n
] of the welding power
sources are synchronised with half of the frequency of the welding
power source (f
1
). The phase shift is adjusted at the pulse generator
between 10 % and 90 %. The picture shows a phase shift of 50 %.
The pulse phases are alternately synchronous.
"Pulse generator (f
1
)" - "Pulse receiver (f
2
)" alternating 1/2.
c) Asynchronous [f
1
≠ f
2
]
With this adjustment all pulse phases [f
1
, f
2
… f
n
] of the welding power
sources involved are executed asynchronously.
Use this adjustment when a synchronisation, also alternating, is not
imperative during welding.
"Pulse generator (f
1
)" - "Pulse receiver (f
2
)" asynchronous
f
1
f
2
a1)
t
I
a2)
t
f
1
f
2
I
b1)
t
f
1
f
2
I
b2)
t
f
1
f
2
I
c)
t
f
1
f
2
Summary of Contents for QINEO
Page 4: ......
Page 10: ......
Page 11: ...11 Operational safety Block 1 Operational Safety...
Page 29: ...29 Block 2 Basic information Qineo Champ Pro...
Page 42: ...CHAMP Pro 42...
Page 109: ...109 Block 4 Additional information...
Page 124: ...124 SD module...
Page 138: ...138 Commissioning 6 7 8 5...
Page 140: ...140 Commissioning 7 5 6 The wire inlet must not touch the wire drive roller INFO...
Page 145: ...145 Block 6a Error messages...
Page 159: ...159 Block 6b General maintenance instructions...
Page 164: ...164...
Page 165: ...165 Block 7 Automation...
Page 184: ...184...
Page 185: ...185...
Page 186: ...www qineo de...