Installation Guide_PV-ezRack_SolarTerraceIII-A_AU_V2.0
1/10 Duerdin Street, Clayton VIC 3168 Australia
Tel: +61 3 9239 8088 Fax: +61 3 9239 8024
E-mail: [email protected] www.clenergy.com.au
20
page
of 28
Installation Instruction
5.2.5 Repeat the above operations and install all other T Rails.Ensure the end faces of the Rails are
aligned and all Rails are at same height. Now fasten all the bolts tightly.
5.3.1 Deployment of Grounding Clip
5.3.1.1 When there is an even number of PV Module in each row.
Install the Grounding clips at the positions marked X in the figure shown. Then the
number of Grounding clips = number of PV Modules. Eg: 4 Grounding clips in the
figure shown.
5.3 PV Module Installation
Fig. 18