750-370
ProFire Q Series Manual
3-9
Operation
3.7.5 — Optional Temperature/Pressure Control Kit
Optional temperature/pressure control kits are available for the Q series. Figure 3-4 is an installation drawing for a
Siemens RWF10 or RWF50 temperature/pressure control kit. Refer to the manufacturers operation and maintenance
manual for the installation and set-up procedures for all other temperature/pressure controls.
FIGURE 3-4.
Temperature Control Installation Example (Siemens)
3.8 — Normal Operation
In automatic operation, the operating cycle always proceeds sequentially through pre-purge, main flame ignition, run,
and post-purge. The length of the purge and ignition trial vary according to the type of programmer used.
During the run cycle, burner input is regulated to the load demand by the modulating pressure or temperature control on
the boiler. The burner will continue to modulate until the operating pressure or temperature is reached.
Programmer control operation should be tested when the burner is initially placed into service, when a control is
replaced, and at scheduled intervals in the maintenance program.
Refer to adjustment procedures and maintenance instruction given in Chapters 4 and 5.
DETAIL A
SCALE .625:1
880-06270-001
A
Summary of Contents for profire q
Page 2: ......
Page 12: ......
Page 22: ...Introduction 1 6 750 370 ProFire Q Series Manual...
Page 48: ...Maintenance 5 6 750 370 ProFire Q Series Manual...
Page 54: ...750 370 ProFire Q Series Manual...
Page 57: ......
Page 58: ...e mail info cleaverbrooks com Web Address http www cleaverbrooks com...