ii
750-370
ProFire Q Series Manual
2.7 — Gas Piping
2-5
2.8 — Installation Checklist
2-5
CHAPTER 3
Operation 3-1
3.1 — Preparations for Starting
3-1
3.1.1 — Firing Preparations for Gas Burners 3-1
3.1.2 — Burner Settings 3-2
3.1.3 — Combustion Settings 3-2
3.1.4 — Test Equipment 3-3
3.2 — Ignition Adjustment
3-3
3.3 — Startup Sequence
3-3
3.4 — Automatic Shutdown
3-4
3.5 — Manual Shutdown
3-4
3.6 — Safety Shutdown
3-4
3.7 — Startup and Operating
3-5
3.7.1 — Gas Burners (Bubble Test) 3-5
3.7.2 — Burners Designed for On-Off Operation 3-6
3.7.3 — Burners Designed for Low-High-Low Operation 3-6
3.7.4 — Burners Designed for Modulation Operation 3-7
3.9 — Normal Operation
3-9
3.10 — Shutdown
3-10
CHAPTER 4
Adjustments 4-1
4.1 — Overview
4-1
4.2 — Combustion Adjustment on Gas
4-1
4.2.1 — Stack Temperature 4-1
4.2.2 — Gas Adjustments 4-2
4.2.3 — Honeywell V48A Gas Valve Adjustment 4-2
4.3 — Electrical Interference Test
4-2
4.4 — Gas System
4-2
4.4.1 — Gas Pressure 4-2
Summary of Contents for profire q
Page 2: ......
Page 12: ......
Page 22: ...Introduction 1 6 750 370 ProFire Q Series Manual...
Page 48: ...Maintenance 5 6 750 370 ProFire Q Series Manual...
Page 54: ...750 370 ProFire Q Series Manual...
Page 57: ......
Page 58: ...e mail info cleaverbrooks com Web Address http www cleaverbrooks com...