
Appendix C
Gas Valve
C-25
UL Listed / R ecognized Component:
File No . MH16727 to UL 429
CSA
File No.157406 to
ANSI Z21.21 / CSA 6.5 with C/I marking
ANSI Z21.18 / CS
A 6.3
FM
7400 Approved
Commonwealth of Massachusetts
Approved Product Approval code G1-1107-35
MBC-SE 1000/2500/4000
GasMultiBloc
®
Combined servo pressure
regulator and safety shut-off valves
Installation Instructions
Table of Contents
USA
CDN
Table of Contents . . . . . . . . . . . . . . . . . . . . . . . .
Page
1
Approvals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Page 1
Attention . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Page 1
. . . . . . . . . . . . . . . . . . . . . . . . . . . .
Page
2
Mounting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Page 3
Painting Valve . . . . . . . . . . . . . . . . . . . . . . . . . . .
Page
4
Protection from Radiant Heat . . . . . . . . . . . . . .
Page
4
Electrical DIN Connector Ratings . . . . . . . . . . .
Page
5
Electrical DIN Connector assembly & wiring . Page
6
MBC Overview & Impulse Lines . . . . . . . . . . . .
Page
7
Outlet Pressure Adjustment . . . . . . . . . . . . . . .
Page 9
Changing co il . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Page
10
Internal F ilter . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Page
12
Test Ports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Page
13
Valve Leakage Decay Test . . . . . . . . . . . . . . . . .
Page
14
Approvals
1, 2, 3 ...
= Action
• =
Instruction
Explanation of symbols
On c ompletion of work on the
safety valve, perform a leakage
and function test.
Please read the instruction be -
fore installing or operating. K eep
the instruction in a safe place. You
the instruction a lso a t www.
dungs.com If these instructions
are not heeded, the result may
be personal injury or damage to
property.
Any ad justment a nd a pplication-
a djustment values must
be made in a ccordance with the
appliance-/boiler manufacturers
instructions.
Attention
Check the ratings in the s peci -
to make s ure that they
are s uitable for your ap plication.
This p roduct i s i ntended f or
installations c overed b y, b ut
not l imited to, the f ollowing
fuel gas c odes a nd s tandards:
NFPA 5 4, I FGC ( International
Fuel G as C ode), or C SA B 149.1
(for C anada) o r the following
equipment c odes and st andards:
CSD-1, U L 795, N FPA 37, A NSI
Z83.4/CSA 3.7, ANSI Z83.18, ANSI
Z21.13/CSA 4.9, or CSA B149.3
(for Canada).
[V ] [A]
[Hz ] [VA ]
Safety
first
O.K.
IFGC
CSA
UL
ANSI
NFPA
The installation and ma intenance
of this product must be done
under the s upervision of a n ex-
perienced a nd trained s pecialist.
Never perform work if gas pres -
sure or power is a pplied, or in
the presence of an open
Valve Leakage Bubble Test (Altern. method) . Page
15
Flow Curve . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Page
16
Pressure Drop for other Gases . . . . . . . . . . . . .
Page
17
Accessories
& Replacement . . . . . . . . . . . . . . .
Page
18
Summary of Contents for ClearFire CFLC Series
Page 6: ...vi...
Page 14: ...Section 1 Introduction 1 8 Part No 750 363...
Page 16: ...Section 2 Installation 2 2 Part No 750 363...
Page 36: ...Section 2 Installation 2 22 Part No 750 363 Figure 2 13 Electrical Connections CFLC FALCON...
Page 38: ...Section 2 Installation 2 24 Part No 750 363...
Page 56: ...Section 3 Stack and Intake Vent Sizing and Installation 3 18 Part No 750 363...
Page 87: ...Section 6 Parts Part No 750 363 6 3 Figure 6 1 Boiler Mechanical Assembly CFLC 4000 5000...
Page 88: ...Section 6 Parts 6 4 Part No 750 363 Figure 6 2 Boiler Mechanical Assembly CFLC 6000 8000...
Page 95: ...Section 6 Parts Part No 750 363 6 11 Figure 6 10 Gas Train CFLC 6000 8000 optional 9 PPM NOx...
Page 97: ...Section 6 Parts Part No 750 363 6 13 Figure 6 12 Gas train CFLC 10000 12000 optional 9 PPM NOx...
Page 98: ...Section 6 Parts 6 14 Part No 750 363 Figure 6 13 Gas Train CFLC 4000 5000 Propane...
Page 99: ...Section 6 Parts Part No 750 363 6 15 Figure 6 14 Gas Train CFLC 6000 8000 Propane...
Page 100: ...Section 6 Parts 6 16 Part No 750 363 Figure 6 15 Gas Train CFLC 10000 12000 Propane...
Page 105: ...Section 6 Parts Part No 750 363 6 21 Figure 6 20 Control Panel...
Page 106: ...Section 6 Parts 6 22 Part No 750 363 Figure 6 21 Cables and Cable Harness...
Page 108: ...Section 6 Parts 6 24 Part No 750 363 Figure 6 23 Casing Insulation 4000 5000 cont d...
Page 109: ...Section 6 Parts Part No 750 363 6 25 Figure 6 24 Casing Insulation 6000 8000...
Page 110: ...Section 6 Parts 6 26 Part No 750 363 Figure 6 25 Casing Insulation 6000 8000 cont d...
Page 115: ...APPENDIX A Falcon Parameters...
Page 116: ......
Page 124: ......
Page 144: ......
Page 145: ...APPENDIX C Gas Valve Page C 3 Siemens Gas Valve Page C 25 Dungs Gas Valve CFLC 4000 5000...
Page 146: ......
Page 147: ...Appendix C Gas Valve C 3...
Page 148: ...Gas Valve Appendix C C 4...
Page 149: ...Appendix C Gas Valve C 5...
Page 150: ...Gas Valve Appendix C C 6...
Page 151: ...Appendix C Gas Valve C 7...
Page 152: ...Gas Valve Appendix C C 8...
Page 153: ...Appendix C Gas Valve C 9...
Page 154: ...Gas Valve Appendix C C 10...
Page 155: ...Appendix C Gas Valve C 11...
Page 156: ...Gas Valve Appendix C C 12...
Page 157: ...Appendix C Gas Valve C 13...
Page 158: ...Gas Valve Appendix C C 14...
Page 159: ...Appendix C Gas Valve C 15...
Page 160: ...Gas Valve Appendix C C 16...
Page 161: ...Appendix C Gas Valve C 17...
Page 162: ...Gas Valve Appendix C C 18...
Page 163: ...Appendix C Gas Valve C 19...
Page 164: ...Gas Valve Appendix C C 20...
Page 165: ...Appendix C Gas Valve C 21...
Page 166: ...Gas Valve Appendix C C 22...
Page 167: ...Appendix C Gas Valve C 23...
Page 168: ...Appendix C Gas Valve C 24...
Page 186: ...Appendix C Gas Valve C 42...
Page 187: ...APPENDIX D Falcon Alert Hold and Lockout Codes...
Page 188: ......
Page 208: ......
Page 210: ......
Page 231: ...Appendix E Falcon Lead Lag E 23 Figure 11 Falcon LL with EMS for remote enable remote setpoint...
Page 232: ...Falcon Lead Lag Appendix E E 24 Figure 12 Falcon Lead Lag with EMS for remote comms monitoring...
Page 245: ...Appendix E Falcon Lead Lag E 37 Model CFW ClearFire hydronic boiler...
Page 282: ......
Page 283: ...APPENDIX F Falcon Program Module...
Page 284: ......
Page 285: ...Appendix F Program Module F 3...
Page 286: ...Program Module Appendix F F 4...
Page 287: ...Appendix F Program Module F 5...
Page 288: ...Program Module Appendix F F 6...
Page 289: ......
Page 290: ...e mail info cleaverbrooks com Web Address http www cleaverbrooks com...