Procedure
Step 1
Pull out all four of the handholds
Figure 15: Chassis handholds
-
-
All four of the chassis handholds pulled out
and the back end of the chassis resting on the
edges of the shelf bracket rails.
1
Step 2
With a person standing at each side of the chassis, insert one hand into each handhold. Slowly lift the chassis.
Avoid sudden twists or moves to prevent injury.
Cisco Catalyst 9400 Series Switches Hardware Installation Guide
60
Installing the Switch
Rack-Mounting the Chassis