Table 12: Site-Planning Activities
Time and Date
Verified By
Activity
Task No.
Space evaluation:
•
Space and layout
•
Floor covering
•
Impact and vibration
•
Lighting
•
Maintenance access
1
Environmental evaluation:
•
Ambient temperature
•
Humidity
•
Altitude
•
Atmospheric contamination
•
Airflow
2
Power evaluation:
•
Input power type
•
Power receptacles (Depends
on power supply)
•
Receptacle proximity to the
equipment
•
Dedicated (separate) circuits
for redundant power supplies
•
UPS for power failures
•
DC systems: Proper gauge
wire and lugs
3
Grounding evaluation:
•
Circuit breaker size
•
CO ground (AC- and
DC-powered systems)
4