Applique
and Cable
Pinouts
The
HD
V.35 applique has oniy
one jumper
JP1
which
selects
Serial
Clock
Transmit
Internal
SCT
from
the
chassis
or
Serial
Clock
Transmit
External
SCTE
to
the chassis
as
the timing
source
for
Signal Detect
SD
when
the applique
is in
DCE
mode
The
default
is
SCTE
for
DTE
mode
which
is
selected
when
the JP1
jumper
is
in To
select
SCT
for
DCE
mode
remove
the
jumper The
cable used
determines
the
mode
of the applique
The
HD
V.35 applique
is illustrated
in
Figure
A-6
Mounting
plate
26-pin
connector
LI
External_
._LEDs
connector
Cable
nut
2_-.
LJJP1
Jumper
Figure
A-6
HO
V.35
AppliqueBottom View
High
Speed
Serial
Interface
The High-Speed
Serial
Interface
HSSI
is
used
with
the
High-Speed
Communications
Interface
HSCI
card and
the
high-speed
serial
applique
APP-LHS
These
devices
comply
with the
EIA/TIA-613
electrical
specification
There
are
no
user-configurable
jumpers on
the
HSCI
card or
APP-LHS
applique
however
the
HSSI
null
modem
cable
is
discussed
and
its
pinout
is
listed in the
following
sections
HSSI
Null
Modem
Cable
Table
A-b
lists
the pinouts
for
null
modem
cable which
uses 50-pin
male
connectors
and
is
used
with
HSSI
The
null
modem
cable can
directly
connect
two
routers
back
to
back
the
two
routers
must be
in
the
same
location
and
both
must be
DTE
devices
This setup allows
you
to
verify the
operation
of
the
HSSI
or
to directly
link
the
routers
in
order
to
build
larger
node
To
connect
two
routers
attach
null
modem
cable
between
the
HSSI
ports
You
must
then turn
on
the
internal
transmit
clock
in
both routers with
the
following
command
hssi
internal-clock
Configure
each
HSSI
port
in the
router
and
all
other routers with
HSSI
ports
with
this
command
When
the
internal
clock
has
been
turned
on
in
router
the yellow send timing
ST
indicator
on
the
applique
lights
When
the
internal
clock
has
been
turned
on
in
both routers
each
end
the
ST
and
receive timing
RT
indicators
light
up on
each
router
Cabling
Specifications
A-il
Summary of Contents for AGS+
Page 1: ...CISCO SYSTEMS ...
Page 11: ...AGS Hardware Installation and Maintenance ...
Page 17: ...Document Conventions xvi AGS Hardware Installation and Maintenance ...
Page 27: ...Chassis Power Budget 1 10 AGS Hardware Installation and Maintenance ...
Page 39: ...Chassis Components 2 12 AGS Hardware Installation and Maintenance ...
Page 57: ...System Bootstrap Diagnostics 4 10 AGS Hardware Installation and Maintenance ...
Page 83: ...Card Illustrations 5 26 AGS Hardware Installation and Maintenance ...
Page 105: ...FOOl Optical Bypass Switch Pinout A 22 AGS Hardware Installation and Maintenance ...
Page 121: ...Applique LED Indicators B lB AGS Hardware Installation and Maintenance ...
Page 125: ...C 4 ACS Hardware Installation and Maintenance ...
Page 127: ...Compliance Provisions D 2 AGS Hardware Installation and Maintenance ...
Page 129: ...E 2 AGS Hardware Installation and Maintenance ...