CSC-P
Parallel
Printer
Interface
Card
Chassis
Limitations
with the
CSC-P
Card
The placement
of the
CSC-P
interface
in
the chassis backplane
is critical
for
correct operation
Ensure
that
the
CSC-ENVM
card
is
in
the
top
slot
of the chassis
and
that
the
processor
card
is
installed
in the
second
slot
Install
the
CSC-P
cards
and
any other bus masters
such
as
the
CSC-R
interface
card
next
to
each
other
in
the chassis with the
CSC-P
in the
slot
below
the
CSC-R
if one
is
installed
There must be
an uninterrupted
series
of bus master cards
in the
card cage
slots
immediately
below
the processor
card Allow no
gaps
between
these cards
Table
F-l
shows
the
recommended
card placement
order for the
CSC-P
in
the chassis
backplane
Table
F-i
CSC-P Card Placement
in
the
Card Cage
Slot
Card
CSC-ENVM
card
Processor
card
Printer
Card
Switch
Settings
The
CSC-P
contains several switchable
startup
options
listed
in
Table
F-2
Table
F-2
CSC-P Switch
Settings
Switch
Setting
Description
SW1
Center
Self-test
SW2
All
on
System bus
address
bits
5W3-l
On
Select
style
of system bus
address
decoding
SW3-2
On
for unit
off for unit
SW3-3
Off
System bus
address
bits
SW3-4
Off
System bus
address
bits
SW4-4
On
Interrupt
level
of card
all
other
SW4
switches
off
F-2
AGS
Hardware
Installation
and Maintenance
Summary of Contents for AGS+
Page 1: ...CISCO SYSTEMS ...
Page 11: ...AGS Hardware Installation and Maintenance ...
Page 17: ...Document Conventions xvi AGS Hardware Installation and Maintenance ...
Page 27: ...Chassis Power Budget 1 10 AGS Hardware Installation and Maintenance ...
Page 39: ...Chassis Components 2 12 AGS Hardware Installation and Maintenance ...
Page 57: ...System Bootstrap Diagnostics 4 10 AGS Hardware Installation and Maintenance ...
Page 83: ...Card Illustrations 5 26 AGS Hardware Installation and Maintenance ...
Page 105: ...FOOl Optical Bypass Switch Pinout A 22 AGS Hardware Installation and Maintenance ...
Page 121: ...Applique LED Indicators B lB AGS Hardware Installation and Maintenance ...
Page 125: ...C 4 ACS Hardware Installation and Maintenance ...
Page 127: ...Compliance Provisions D 2 AGS Hardware Installation and Maintenance ...
Page 129: ...E 2 AGS Hardware Installation and Maintenance ...