LIST
Table
1-1
Table
1-2
Table
1-3
Table 1-4
Table 1-5
Table
1-6
Table
1-7
Table
1-8
Table
1-9
Table
2-1
Table
2-2
Table
2-3
Table
2-4
Table
2-5
Table
2-6
Table
2-7
Table
4-1
Table 4-2
Table
5-1
Table 5-2
Table 5-3
Table 5-4
Table 5-5
Table 5-6
Table
5-7
Table 5-8
Table 5-9
Table
A-i
Table
A-2
Table
A-3
Table
A-4
Table
A-S
Table A-B
Table A-i
OF
TABLES
Chassis
Physical
Power
and
Cooling
Specifications
1-3
Processor
Card
Descriptions
1-4
ciscoBus
Controller
Card and
ciscoBus
Interface
Card
Compatibility
1-5
Memory
Cards
1-5
CiscoBus Network
Interface
Cards
1-6
Multibus
Network
Interface
Cards
1-6
Card and
Port Limits
for
the Chassis
1-7
Chassis
Connector
Plates
1-8
Power
Requirements
for
Individual
Components
1-9
Chassis
Air
Temperature
and
Voltage
Warning
and
Fatal Thresholds
2-4
Chassis
Environmental
Specifications
2-4
FDDI Maximum
Transmission
Distances
2-8
Ethernet
UTP
Maximum
Transmission
Distances
2-9
IEEE
Standard
RS-232
Transmission
Speed
Versus
Distance
2-9
IEEE
Standard
RS-449
Transmission
Speed
Versus
Distance
2-9
Descriptions
of Chassis
Components
2-11
Nonvolatile
Memory
Addresses
4-7
Memory
Test
and
Memory ProbeTest
Times
4-9
Default
Boot
FilenamesBoot
Field
Jumpers
5-5
Configuration
Register Settings
for
Broadcast
Address
Destination
5-6
System Console
Port
Baud
Rate
Settings
5-6
CSC-MCI
and
CSC-SCI
Switch
Si
Settings for
Card Numbering
5-10
CSC-MCI
Jumper
Settings
for
Clock
Options
5-11
CSC-SCI
Jumper
Settings
for
Clock
Options
5-12
CSC-MCI
Jumper
Settings
for
Grounding
Options
5-12
CSC-lR
and
CSC-2R
Card-Numbering
Switch
Settings
5-14
CSC-R16M
Card-Numbering
Switch
Settings
5-16
CPU
Console
Port
RS-232
DCE
Wiring Scheme
A-2
CPU
Auxiliary Port
RS-232
DTE
Wiring Scheme
A-2
lOBaseT RJ-45 Connector
Pinout
A-4
Ethernet
AliT
Pinout
A-S
CSC-1R CSC-2R
and
CSC-R16M
Token
Ring
Applique
Pinout
A-6
CSC-C2CTR
Token
Ring Applique
Pinout
APP-LTR2
A-6
ED
V.35 Dual-Mode
Applique and
Cable
Pinout
A-9
List
ofTables
xi
Summary of Contents for AGS+
Page 1: ...CISCO SYSTEMS ...
Page 11: ...AGS Hardware Installation and Maintenance ...
Page 17: ...Document Conventions xvi AGS Hardware Installation and Maintenance ...
Page 27: ...Chassis Power Budget 1 10 AGS Hardware Installation and Maintenance ...
Page 39: ...Chassis Components 2 12 AGS Hardware Installation and Maintenance ...
Page 57: ...System Bootstrap Diagnostics 4 10 AGS Hardware Installation and Maintenance ...
Page 83: ...Card Illustrations 5 26 AGS Hardware Installation and Maintenance ...
Page 105: ...FOOl Optical Bypass Switch Pinout A 22 AGS Hardware Installation and Maintenance ...
Page 121: ...Applique LED Indicators B lB AGS Hardware Installation and Maintenance ...
Page 125: ...C 4 ACS Hardware Installation and Maintenance ...
Page 127: ...Compliance Provisions D 2 AGS Hardware Installation and Maintenance ...
Page 129: ...E 2 AGS Hardware Installation and Maintenance ...