Freeze-dryer Gamma 1-16 LSCplus
Freeze-dryer Gamma 2-16 LSCplus
11 Appendix
108 / 126
Version 04/2013, Rev. 2.10 of 09/03/2020
• sb-dc
Translation of the original operating manual
1
Status line
2
Set process values
3
Button "Set values:
view/edit"
4
Actual values of the
current process
5
Button "Tools"
6
Button "Schematic
system diagram"
7
Button "Process and
equipment messages"
8
Button "Operating
mode: select/start"
9
Button "Stop"
Fig. 78: LSCplus user interface
Step-by-step instructions
– shelf drying
1
Freeze the sample separately, e.g. in a deep-freeze.
NOTE
Ensure that the layer thickness of 1 to 2 cm is not exceeded, since
otherwise the drying time needs to be extended.
2
Check the ice condenser chamber and ensure that it is completely free
from water residues.
3
Close the condensate drain valve and install the base plate.
4
Switch the unit on 20 to 30 minutes prior to the start of the drying
process in order to let the vacuum pump warm up.
5
Place the plate rack on the base plate.
6
Transport the frozen samples as quickly as possible from the deep-
freeze to the freeze-dryer and place them on the shelves.
NOTE
Recommendation: Store the product vessels on the aluminium shelves or,
if possible, the entire rack with the shelves in the deep- freeze. The
advantage is that due to the higher cold storage capacity of the aluminium
material, the product will remain frozen for a longer period of time so that
the sample will not thaw.
7
Install the drying chamber. Prior to doing so, check whether the O-ring
is completely free of dirt particles. The ground-in stopper of the acrylic
glass bell must be greased with high-vacuum grease.
8
Ensure that all of the valves of the acrylic glass bell are closed.
9
Ensure that the aeration valve is closed.
10
Ensure that the condensate drain valve is closed.
11
Start the main drying process either by opening the manual shut-off
valve or by waiting for the electromagnetic valve to open. Vacuum is
applied to the chamber and the freeze-drying process commences.