CONCRETE PAD AND OPERATOR ATTACHMENT
Check the national and local building codes before installation.
Install the electrical conduit.
Pour a concrete pad (reinforced concrete is recommended). The concrete pad
should be 6 inches above the ground and deeper than the frost line.
Attach the operator to the concrete pad with appropriate fasteners.
NOTE:
An alternative to a concrete pad is to post mount the operator
(refer to accessories).
INSTALLATION
» DETERMINE LOCATION FOR CONCRETE PAD AND OP CONCRETE PAD AND
OPERATOR ATTACHMENT
DETERMINE LOCATION FOR CONCRETE PAD AND
OPERATOR
The gate operator should be installed near the front roller of the gate or near
the back of the gate (in the OPEN position). The space between the gate and
the output sprocket must be a minimum of 4 inches.
Lay out the concrete pad.
4"(10 cm)
24"
(61cm)
1
2
3
STANDARD INSTALLATION
REAR INSTALLATION
1
2
1
2
4"(10 cm)
24"
(61cm)
24" (61cm)
24"
(61cm)
4 Concrete Anchors
1/2" x 3 1/2"
Below the frost line.
Check all national and
local codes.
6" Above Ground
1 3
2
24"
(61cm)
24"
(61cm)
13.65"
MOUNTING FOOTPRINT
7.49"
(Electrical
Box)
.63"
1
2
10