GATE 1
GR
WH
YL
BL
RD
BR
GATE 2
GATE 1
GR
WH
YL
BL
RD
BR
GR
WH
YL
BL
RD
BR
GATE 2
GR
WH
YL
BL
RD
BR
Terminal Block Connector
Red
Red
Blue
Blue
Green
Green
Brown
Brown
White
Yellow
Yellow
White
Extension Cable
WIRING
» PRIMARY / SECONDARY OPERATORS
PRIMARY/SECONDARY OPERATORS
NOTE:
Use the Dual Gate Wiring Kit. Refer to the accessory page for more
information.
Before digging, contact local underground utility locating companies. Choose one
operator to be the primary and the other operator to be the secondary.
The control board in the secondary operator is not used
.
Trench across driveway to bury the extension cable.
Disconnect the terminal block connector (with the attached label) from the end
of the extension cable. Thread the extension cable through the bottom of the
primary operator (using the watertight connectors) and reconnect the extension
cable wires to the terminal block connector.
Connect the terminal block (with the attached label) to the GATE 2 connector of
the primary operator's control board.
Disconnect the terminal block connector from the other end of the extension
cable. Thread the extension cable through the bottom of the secondary
operator (using the watertight connectors) and reconnect the wires to the
terminal block connector.
Disconnect the wires from the GATE 1 connector on the secondary operator and
connect them to the terminal block connector.
Move the battery from the secondary operator to the primary operator.
Connect the plugs from the batteries to the connectors on the control board.
Check to make sure the LOCK/BIPART DELAY switch is OFF on the primary
control board. Factory default setting is OFF.
1
2
3
4
5
6
2
1
3
4
5
Gate 2
Gate 1
PRIMARY OPERATOR
SECONDARY OPERATOR
Gate 1
SECONDARY
CONTROL BOARD
NOT USED
GATE 2
ACCESSORY
POWER
GATE 1
GR
WH
YL
BL
RD
BR
GR
WH
YL
BL
RD
BR
12 V
LOCK /
ON
OFF
BIPART DELAY
6
7
Battery from secondary operator
Battery from primary operator
PRIMARY OPERATOR
Extension
Cable
Gate 1
Secondary
Operator
7
Label
Extension Cable
14