Hybrid
Vertical
Stack
–
Installation
Operation
Maintenance
Manual
INFORMATION
R090303
Installation
Operation
Maintenance
Manual
is
subject
to
change
without
notice
Page
2
5.
The
individual
units
shall
not
be
stacked
on
top
of
one
another.
6.
If
the
unit
was
previously
in
use,
ensure
that
all
water
in
the
coil
has
been
blown
out
and
that
all
hose
connections
are
plugged
during
storage.
Weight/Dimension/Clearance
Unit
Weight:
Model
008
010
012
015
018
020
024
030
036
Weight
(lb)
115
120
120
135
145
210
225
225
240
Unit
Dimension:
Models
008
‐
018
Models
020
‐
036
Unit
Clearance:
The
vertical
stack
product
has
a
sound
‐
dampening
front
cover
panel
and
return
air
boot.
The
sound
‐
dampening
panel
slides
off
with
minimal
service
clearance,
however,
in
the
event
of
chassis
replacement
the
front
service
entrance
must
permit
straight
horizontal
removal
of
the
chassis.
The
return
air
boot
must
be
unobstructed
during
operation.
The
installation
of
all
vertical
stack
product
and
components
and
accessories
must
be
in
accordance
with
all
local
code
and
regulations
of
all
governing
authorities
having
jurisdiction.
The
manufacturer
recommends
the
following
installation
procedures.
It
is
the
responsibility
of
the
installing
contractor
to
comply
with
all
applicable
codes
and
regulations.
Figure
1
Figure
2