Hybrid
Vertical
Stack
–
Installation
Operation
Maintenance
Manual
INSTALLATION
R090303
Installation
Operation
Maintenance
Manual
is
subject
to
change
without
notice
Page
3
The
information
below
details
the
correct
installation
procedure
for
a
vertical
stack
unit.
Please
read
this
document
in
its
entirety
prior
to
proceeding
with
unit
installation.
Specific
site
conditions
may
warrant
variations
in
locations
and
dimensions.
GENERAL
INSTALLATION
CHECKLIST
1.
Remove
packaging
and
inspect
the
unit.
Carefully
check
for
shipping
damage
or
material
shortage;
file
a
freight
claim
and
notify
appropriate
sales
representative
if
damage
is
found.
NOTE:
The
chassis,
front
panel,
and
return
air
boot
ship
separately
from
the
cabinet
and
risers.
2.
Verify
the
correct
model
and
voltage
as
indicated
by
the
model
number.
3.
Verify
the
installation
location
of
the
unit
using
the
sheet
metal
template
that
is
provided.
4.
Verify
that
the
power
supply
complies
with
the
nameplate
specification.
5.
Connect
properly
sized
and
protected
power
supply
wiring
to
the
electrical
receptacle
in
the
cabinet.
6.
Install
proper
grounding
wires
to
an
earth
ground.
Figure
3