Non contractual document - Cassese France
®
- Document non contractuel
- 28 -
7.G. REPLACEMENT OF THE WEDGE DISTRIBUTION CHANNEL ELASTIC CORD
After proceeded to procedure
6.C. REMOVING THE SIDE PANEL
, perform this following procedure
to ensure a good replacement of this piece :
Pull the wire with ball in order to have access
to unscrew the second screw.
Tighten the screw which locking the elastic
cord with the wire with ball together on the
wire pushing spring.
Insert the new elastic cord in the same way
that you remove the old elastic cord in order
to get it back outside the machine.
Loosen the screw with the 4mm Allen key at
the end of wedge distribution channel.
Loosen the screw with the 4mm Allen key at
the top of the wedge distribution channel.
Shift the elastic cord in order to get it back.
Tighten the screw at the bottom of the wedge
distribution channel.
Summary of Contents for MACH 1 UNI
Page 2: ......
Page 29: ...Non contractual document Cassese France Document non contractuel 29...
Page 30: ...ontractual document Cassese France Document non contractuel 30...
Page 32: ...Non contractual document Cassese France Document non contractuel 32...
Page 59: ...Non contractual document Cassese France Document non contractuel 59...