![Carrier PIC 5+ Installation, Operation And Maintenance Instructions Download Page 35](http://html.mh-extra.com/html/carrier/pic-5/pic-5_installation-operation-and-maintenance-instructions_2562218035.webp)
35
Fig 16
– Machine Rigging Guide (comp frame size DV4)
Notes :
1. Each chain must be capable of supporting the entire weight of the machine. See chart for maximum
weight. (The maximum weights shown cover weights from steel and copper tubing, insulation, and
refrigerant charge, excluding water weight.)
2. Chain lengths shown are typical for 4.5 m lifting height. Some minor adjustments may be required.
Dimensions A and B define distance from machine center of gravity to tubesheet outermost surfaces. Dim
“C” defines distance from machine c.o.g. to floor. Dim “D” defines distance measured between the chain and
lifting hooks.
3. Rigging can be different and specific if unit is equipped of special components or devices which
could have interference with chain way. Please refer always to the official dimensional drawings of
the ordered job and contact customer service to get more information for rigging.
IMPORTANT : Make sure that rigging cable is over the rigging bar before lifting.
Summary of Contents for PIC 5+
Page 26: ...26 VFD not shown Fig 13 Sensors actuators location ...
Page 52: ...52 Fig 24 19DV control box ...
Page 53: ...53 1 Power supply 24V AC 2 LEN 3 CCN 4 Ethernet 5 USB Fig 25 19DV HMI box rear view ...
Page 54: ...54 Fig 26 19DV IOB1 wiring Fig 27 19DV IOB2 wiring ...
Page 57: ...57 ...
Page 113: ...113 APPENDIX A SmartView SCREEN AND MENU STRUCTURE ...
Page 114: ...114 Detailed menu description ...
Page 116: ...116 APPENDIX B MAINTENANCE SUMMARY AND LOGSHEETS Cont 19DV monthly Maintenance Log ...