background image

Fig.

17—Wiring

Diagram

A91349

H

M

L

C

INDOOR

BLOWER

MOTOR

BR

BR

CAP

.

I.D.

BLOWER

LEGEND

L1(H)

L2(N)

CIRCULATION

FAN

LOW

TSTAT

24VAC

(115 VAC)

NOTES:

(1) Make field power supply connections to black and white wires capped 

with orange wire nuts.

(2) WARNING --- Unit must be grounded. Wiring must conform to N.E.C. 

and local codes.

(3) If any of the original wire, as supplied with the furnace, must be 

replaced, it must be replaced with wiring material having a temperature 

rating of at least 185 C and be a minimum of 16 GA. AWG copper 

strand wire.

(4) Connect required motor lead to heat terminal on circuit board to deliver 

a temperature rise within the range specified on the rating plate.  

Connect unused motor leads to the "M1 & M2" terminals.

LINE Y 

24 V

PRINTED CIRCUIT

BOARD WIRING

FACTORY WIRING

FIELD WIRING

ORANGE WIRE NUT

GROUND

BK

BL

BR

GR

OR

RD

RD/BK

VI

WH

YL

BLACK

BLUE

BROWN

GREEN

ORANGE

RED

RED/BLACK STRIPE

VIOLET

WHITE

YELLOW

L

P

ROS

BI

CU

LIMIT

PRESSURE SWITCH

ROLL OUT SWITCH

BLOWER INTERLOCK

CONDENSING UNIT

115 VAC 1 0 60 HZ POWER SUPPLY

(FUSED DISCONNECT ON HOT LEG)

1

2

3

4

60 SEC

90 SEC

120 SEC

DELAY  OFF  SCREW SETTINGS

150 SEC 

MED

HI

GND

N2

HEAT

COOL

N3

D1

N4

C

BI

S1

S2

M2

K1

K2

K2

K3

X

R

Y

C

W

G

CN23-2

CN23-1

CN23-6

LIMIT

CONTROL

TRANSFORMER

CONDENSING

UNIT

PRESSURE SW.

N.O.

N.C.

PS1

PS2

V1

CN23-3

CN23-5

COM.

ST912081005

ELECTRONIC

FAN TIMER

ROS

MV

PV

MV\PV

MV

MV\PV

PV

24V (GNO)

GNO (BURNER)

SPARK

GAS VALVE

HONEYWELL VR8204

PILOT

24V

IGNITION MODULE

HONEYWELL S8600

OR 8660

N1

GNO

MV/PV

MV

G.V.

GND

PV

L1 (H)

L2 (N)

POWER SUPPLY

115 VAC 10 60 HZ

(FUSED DISCONNECT

ON HOT LEG)

GND

VI

ROS

P

BK

BK

CU

T

R

Y

W

G

BI

BK

WH

G

H

C

O

Y

R

L

RD

OR

VI

WH

RD

BK

GR

BK

YL

BL

VI

OR

PILOT

HONEYWELL

S8600

IS

1

2

3

4

5

6

7

8

9

MV

MV/PV

PV

GNO (BURNER)

24V (GNO)

24V

TH-W (OPT)

SPARK

WH

BL

RD/

BK

YL

BC

DELAY OFF

SELECT

A

B

H

E

A

T

C

O

O

L

M1

M2

M3

UNUSED

MOTOR

LEADS

S

1

2

3

4

5

6

1

2

3

4

D1

C

C

X

X

Y

100, 125K INPUT

50, 75K INPUT

BL

YL

INDUCER MOTOR

100,125

FOR 75, 100, 125

50, 75

Copyright 1994 CARRIER Corp. • 7310 W. Morris St. • Indianapolis, IN 46231

45001c

Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.

Book 1

4

Tab

6a 8a

PC 101

Catalog No. 535-869

Printed in U.S.A.

Form 58EJB-1SI

Pg 16

2-94

Replaces: 58EJA-3SI

Summary of Contents for 101 Series

Page 1: ...ther than wood The design of this furnace line is not A G A certified for installation in recreational vehicles manufactured housing mobile homes or outdoors Before installing this furnace refer to the current edition of the NFGC NFPA 54 1992 ANSI Z223 1 1992 which is available from the National Fire Protection Association Inc Batterymarch Park Quincy MA 02269 American Gas Association 1515 Wilson ...

Page 2: ...n UNIT SIZE 050 075 100 AND 125 Sides 0 Back 0 Top of Plenum 0 Vent Connector PVC Pipe 0 Front Casing 1 Front Service 30 Zero in with controls on front of furnace 1 in from back of elbow with combustion air inlet on back of furnace and 1 in from end of inducer motor with controls located on back of furnace Measured from end of inducer motor Table 2 Dimensions In UNIT SIZE LENGTH WIDTH WEIGHT LB 05...

Page 3: ...TION RELATIVE TO COOLING EQUIP MENT The cooling coil must be installed parallel with or on the downstream side of the furnace to avoid condensation in the heat exchanger When installed parallel with a furnace dampers or other means used to control the flow of air must prevent chilled air from entering the furnace If the dampers are manually operated they must be equipped with a means to prevent op...

Page 4: ... with appropriate straps hangers etc Use a minimum of 1 hanger every 6 ft Joint compounds pipe dope should be applied sparingly and only to the male threads of the joints This pipe dope must be resistant to the action of propane gas Install a sediment trap in the riser leading to the furnace The trap can be installed by connecting a tee to the riser leading to the furnace so that the straight thro...

Page 5: ...4 V WIRING Make field 24 v connections at the 24 v termi nal block Connect Y terminal as shown in Fig 4 for proper cooling operation The 24 v terminal board is marked for easy connection of field wiring See Fig 5 NOTE Use AWG No 18 color coded copper thermostat wire for lengths up to 100 ft For wire lengths over 100 ft use AWG No 16 wire ACCESSORIES Install accessories per manufacturer s instruc t...

Page 6: ...Standards COMBUSTION AIR AND VENT PIPING The combustion air and vent pipe fittings must conform to American National Standards Institute ANSI standards and American Society for Testing and Materials ASTM standards D1785 schedule 40 PVC D2665 PVC DWV D2241 SDR 21 and SDR 26 PVC D2661 ABS DWV or F628 schedule 40 ABS Pipe cement and primer must conform to ASTM standards D2564 PVC or D2235 ABS See Tab...

Page 7: ...ing such as when it passes through an unheated space or when a chimney is used as a raceway the pipe must be insulated with 1 2 in thick Armaflex type insulation When the combustion air pipe is installed above a suspended ceiling the pipe must be insulated with 1 2 in Armaflex type insulation The combustion air pipe should also be insulated when it passes through a warm humid space Solvent cements...

Page 8: ...lation level or grade whichever is greater b Minimum of 4 ft clearance must be provided from electric or gas meters regulators and relief equipment 4 Install 90 elbows as shown in Fig 6 or 7 or use a 180 U fitting 5 Install tee as shown in Fig 6 or 7 6 Check required dimensions as shown in Fig 6 or 7 7 Disassemble loose pipe fittings Clean and cement fittings using same procedures as outlined for ...

Page 9: ...ield reversal be sure to have a correct wiring diagram available and be prepared to mark all wires as they are disconnected The inducer assembly burner controls gas valve and electrical controls are designed to be field reversed as necessary for certain field installations and applications per the following procedure 1 Remove manifold cover plate and air inlet plate burner re moval cover 2 Disconn...

Page 10: ...all vent return pipe so pipe outlet is facing rear of unit Reinstall 4 washers and nuts securing pipe to heat exchanger bottom plate Remove and discard cardboard previously placed between fins and pipe Remove patch plate and cut insulation on rear center panel and position vent return pipe through panel Secure pipe to panel with 4 screws 30 Remove blower motor wiring harness strain relief from fro...

Page 11: ...umper wire on pressure switches 11 Turn on gas valve 12 Turn on electrical supply to unit Unit should begin ignition cycle Step 11 Start up Adjustment and Safety Check GENERAL The furnace must have a 115 v power supply properly connected and grounded Proper polarity must be main tained for correct operation Thermostat wire connections at R W Y G and C must be made at the 24 v terminal block on the...

Page 12: ... 34 35 36 3 2 3 3 3 7 890 38 39 3 4 3 7 37 38 39 3 2 3 5 3 8 37 38 3 3 3 6 37 38 3 4 3 8 36 37 3 2 3 5 36 37 3 3 3 6 36 37 3 4 3 7 36 3 5 35 36 3 2 3 6 905 38 39 40 3 3 3 6 3 8 38 39 3 4 3 7 37 38 39 3 2 3 5 3 8 37 38 3 3 3 6 37 38 3 4 3 8 36 37 3 2 3 5 36 37 3 3 3 6 36 37 3 4 3 7 36 37 3 5 3 8 920 38 39 40 3 2 3 4 3 7 38 39 40 3 3 3 6 3 8 38 39 3 4 3 7 37 38 39 3 2 3 5 3 8 37 38 3 3 3 6 37 38 3 4...

Page 13: ... pressure item c and replace the main burner orifices as needed Refer to NFGC Appendix F Table F 4 for proper orifice sizing at high altitudes 8 Proceed to item c to adjust manifold pressure c Adjust gas input NOTE The gas meter must always be clocked with the burner enclosure front installed The gas valve has been nominally set at 3 5 in wc for natural gas 1 Remove burner enclosure front and cap ...

Page 14: ...selector located at the blower motor See Table 10 Table 10 Blower Speed Selection SPEED TAP NO Common 1 High 2 Medium 3 Low 4 Recheck the temperature rise It must be within limits specified on the unit rating plate Recommended operation is at midpoint of rise or above 3 Set thermostat heat anticipator The thermostat heat anticipator must be set to match the amp draw of the components in the R to W...

Page 15: ...drain safety switch This control ensures the condensate drain is open to allow condensate flow and that combustion air is flowing through the unit prior to starting the ignition cycle The blocked drain safety switch has only 1 tube connected to it Check switch operation as follows a Place unit into operation with burners on b Pinch off tube leading to pressure switch P2 The burners should shut off...

Page 16: ...D DISCONNECT ON HOT LEG 1 2 3 4 60 SEC 90 SEC 120 SEC DELAY OFF SCREW SETTINGS 150 SEC MED HI GND N2 HEAT COOL N3 D1 N4 C BI S1 S2 M2 K1 K2 K2 K3 X R Y C W G CN23 2 CN23 1 CN23 6 LIMIT CONTROL TRANSFORMER CONDENSING UNIT PRESSURE SW N O N C PS1 PS2 V1 CN23 3 CN23 5 COM ST912081005 ELECTRONIC FAN TIMER ROS MV PV MV PV MV MV PV PV 24V GNO GNO BURNER SPARK GAS VALVE HONEYWELL VR8204 PILOT 24V IGNITIO...

Reviews: