background image

Table 9—Gas Rate Cu Ft/Hr

SECONDS

FOR 1

REVOLUTION

SIZE OF TEST DIAL

SECONDS

FOR 1

REVOLUTION

SIZE OF TEST DIAL

1

cu ft

2

cu ft

5

cu ft

1

cu ft

2

cu ft

5

cu ft

10
11
12
13
14

360
327
300
277
257

720
655
600
555
514

1800
1636
1500
1385
1286

50
51
52
53
54

72
71
69
68
67

144
141
138
136
133

360
355
346
340
333

15
16
17
18
19

240
225
212
200
189

480
450
424
400
379

1200
1125
1059

100
947

55
56
57
58
59

65
64
63
62
61

131
129
126
124
122

327
321
316
310
305

20
21
22
23
24

180
171
164
157
150

360
343
327
313
300

900
857
818
783
750

60
62
64
66
68

60
58
56
54
53

120
116
112
109
106

300
290
281
273
265

25
26
27
28
29

144
138
133
129
124

288
277
267
257
248

720
692
667
643
621

70
72
74
76
78

51
50
48
47
46

103
100

97
95
92

257
250
243
237
231

30
31
32
33
34

120
116
113
109
106

240
232
225
218
212

600
581
563
545
529

80
82
84
86
88

45
44
43
42
41

90
88
86
84
82

225
220
214
209
205

35
36
37
38
39

103
100

97
95
92

206
200
195
189
185

514
500
486
474
462

90
92
94
96
98

40
39
38
38
37

80
78
76
75
74

200
196
192
188
184

40
41
42
43
44

90
88
86
84
82

180
176
172
167
164

450
439
429
419
409

100
102
104
106
108

36
35
35
34
33

72
71
69
68
67

180
178
173
170
167

45
46
47
48
49

80
78
76
75
73

160
157
153
150
147

400
391
383
375
367

110
112
116
120

33
32
31
30

65
64
62
60

164
161
155
150

c. Adjust temperature rise by adjusting blower speed. Increase

blower speed to reduce temperature rise. Decrease blower
speed to increase temperature rise.

Disconnect the electrical power before changing the speed
tap. Failure to follow this warning could result in personal
injury.

d. To change motor speed taps, remove the motor tap lead and

relocate it on the desired terminal on the plug in terminal
block/speed selector located at the blower motor. (See
Table 10.)

Table 10—Blower Speed Selection

SPEED

TAP NO.

Common

1

High

2

Medium

3

Low

4

Recheck the temperature rise. It must be within limits
specified on the unit rating plate. Recommended operation is
at midpoint of rise or above.

3. Set thermostat heat anticipator.

The thermostat heat anticipator must be set to match the amp draw
of the components in the R to W circuit. Accurate amp draw
measurements can be obtained at the thermostat subbase terminals
R and W.

Fig. 16 illustrates an easy method of obtaining these measure-
ments. The amp reading should be taken after the blower motor has
started. See the thermostat manufacturer’s instructions for adjust-
ing the heat anticipator and for varying the heating cycle length.

CHECK SAFETY CONTROLS

1. Check primary limit control.

The control shuts off the combination control system and energizes
the circulating-air blower motor if the furnace overheats.

The recommended method of checking this limit control is to
gradually block off the return air after the furnace has been
operating for a period of at least 5 minutes. As soon as the limit
control has shut off the burners, the return-air opening should be
unblocked to permit normal air circulation. By using this method
to check the limit control, it can be established that the limit is
functioning properly and will operate if there is a restricted
circulating-air supply or motor failure. If the limit control does not
function during this test, the cause must be determined and
corrected.

2. Check pressure switch P1 (blocked-vent shutoff switch).

Fig. 15—Burner Flame

A84076

BURNER  FLAME

PILOT  FLAME

BURNER

MANIFOLD

Fig. 16—Amp Draw Check with Ammeter

A80201

R

Y W G

10 TURNS

THERMOSTAT SUBBASE
TERMINALS WITH
THERMOSTAT REMOVED

HOOK-AROUND

VOLT/AMMETER

EXAMPLE:

5.0 AMPS ON AMMETER
10 TURNS AROUND JAWS

 

= 0.5 AMPS FOR THERMOSTAT SETTING

FROM UNIT 24-VOLT
TERMINAL BLOCK

14

Summary of Contents for 101 Series

Page 1: ...ther than wood The design of this furnace line is not A G A certified for installation in recreational vehicles manufactured housing mobile homes or outdoors Before installing this furnace refer to the current edition of the NFGC NFPA 54 1992 ANSI Z223 1 1992 which is available from the National Fire Protection Association Inc Batterymarch Park Quincy MA 02269 American Gas Association 1515 Wilson ...

Page 2: ...n UNIT SIZE 050 075 100 AND 125 Sides 0 Back 0 Top of Plenum 0 Vent Connector PVC Pipe 0 Front Casing 1 Front Service 30 Zero in with controls on front of furnace 1 in from back of elbow with combustion air inlet on back of furnace and 1 in from end of inducer motor with controls located on back of furnace Measured from end of inducer motor Table 2 Dimensions In UNIT SIZE LENGTH WIDTH WEIGHT LB 05...

Page 3: ...TION RELATIVE TO COOLING EQUIP MENT The cooling coil must be installed parallel with or on the downstream side of the furnace to avoid condensation in the heat exchanger When installed parallel with a furnace dampers or other means used to control the flow of air must prevent chilled air from entering the furnace If the dampers are manually operated they must be equipped with a means to prevent op...

Page 4: ... with appropriate straps hangers etc Use a minimum of 1 hanger every 6 ft Joint compounds pipe dope should be applied sparingly and only to the male threads of the joints This pipe dope must be resistant to the action of propane gas Install a sediment trap in the riser leading to the furnace The trap can be installed by connecting a tee to the riser leading to the furnace so that the straight thro...

Page 5: ...4 V WIRING Make field 24 v connections at the 24 v termi nal block Connect Y terminal as shown in Fig 4 for proper cooling operation The 24 v terminal board is marked for easy connection of field wiring See Fig 5 NOTE Use AWG No 18 color coded copper thermostat wire for lengths up to 100 ft For wire lengths over 100 ft use AWG No 16 wire ACCESSORIES Install accessories per manufacturer s instruc t...

Page 6: ...Standards COMBUSTION AIR AND VENT PIPING The combustion air and vent pipe fittings must conform to American National Standards Institute ANSI standards and American Society for Testing and Materials ASTM standards D1785 schedule 40 PVC D2665 PVC DWV D2241 SDR 21 and SDR 26 PVC D2661 ABS DWV or F628 schedule 40 ABS Pipe cement and primer must conform to ASTM standards D2564 PVC or D2235 ABS See Tab...

Page 7: ...ing such as when it passes through an unheated space or when a chimney is used as a raceway the pipe must be insulated with 1 2 in thick Armaflex type insulation When the combustion air pipe is installed above a suspended ceiling the pipe must be insulated with 1 2 in Armaflex type insulation The combustion air pipe should also be insulated when it passes through a warm humid space Solvent cements...

Page 8: ...lation level or grade whichever is greater b Minimum of 4 ft clearance must be provided from electric or gas meters regulators and relief equipment 4 Install 90 elbows as shown in Fig 6 or 7 or use a 180 U fitting 5 Install tee as shown in Fig 6 or 7 6 Check required dimensions as shown in Fig 6 or 7 7 Disassemble loose pipe fittings Clean and cement fittings using same procedures as outlined for ...

Page 9: ...ield reversal be sure to have a correct wiring diagram available and be prepared to mark all wires as they are disconnected The inducer assembly burner controls gas valve and electrical controls are designed to be field reversed as necessary for certain field installations and applications per the following procedure 1 Remove manifold cover plate and air inlet plate burner re moval cover 2 Disconn...

Page 10: ...all vent return pipe so pipe outlet is facing rear of unit Reinstall 4 washers and nuts securing pipe to heat exchanger bottom plate Remove and discard cardboard previously placed between fins and pipe Remove patch plate and cut insulation on rear center panel and position vent return pipe through panel Secure pipe to panel with 4 screws 30 Remove blower motor wiring harness strain relief from fro...

Page 11: ...umper wire on pressure switches 11 Turn on gas valve 12 Turn on electrical supply to unit Unit should begin ignition cycle Step 11 Start up Adjustment and Safety Check GENERAL The furnace must have a 115 v power supply properly connected and grounded Proper polarity must be main tained for correct operation Thermostat wire connections at R W Y G and C must be made at the 24 v terminal block on the...

Page 12: ... 34 35 36 3 2 3 3 3 7 890 38 39 3 4 3 7 37 38 39 3 2 3 5 3 8 37 38 3 3 3 6 37 38 3 4 3 8 36 37 3 2 3 5 36 37 3 3 3 6 36 37 3 4 3 7 36 3 5 35 36 3 2 3 6 905 38 39 40 3 3 3 6 3 8 38 39 3 4 3 7 37 38 39 3 2 3 5 3 8 37 38 3 3 3 6 37 38 3 4 3 8 36 37 3 2 3 5 36 37 3 3 3 6 36 37 3 4 3 7 36 37 3 5 3 8 920 38 39 40 3 2 3 4 3 7 38 39 40 3 3 3 6 3 8 38 39 3 4 3 7 37 38 39 3 2 3 5 3 8 37 38 3 3 3 6 37 38 3 4...

Page 13: ... pressure item c and replace the main burner orifices as needed Refer to NFGC Appendix F Table F 4 for proper orifice sizing at high altitudes 8 Proceed to item c to adjust manifold pressure c Adjust gas input NOTE The gas meter must always be clocked with the burner enclosure front installed The gas valve has been nominally set at 3 5 in wc for natural gas 1 Remove burner enclosure front and cap ...

Page 14: ...selector located at the blower motor See Table 10 Table 10 Blower Speed Selection SPEED TAP NO Common 1 High 2 Medium 3 Low 4 Recheck the temperature rise It must be within limits specified on the unit rating plate Recommended operation is at midpoint of rise or above 3 Set thermostat heat anticipator The thermostat heat anticipator must be set to match the amp draw of the components in the R to W...

Page 15: ...drain safety switch This control ensures the condensate drain is open to allow condensate flow and that combustion air is flowing through the unit prior to starting the ignition cycle The blocked drain safety switch has only 1 tube connected to it Check switch operation as follows a Place unit into operation with burners on b Pinch off tube leading to pressure switch P2 The burners should shut off...

Page 16: ...D DISCONNECT ON HOT LEG 1 2 3 4 60 SEC 90 SEC 120 SEC DELAY OFF SCREW SETTINGS 150 SEC MED HI GND N2 HEAT COOL N3 D1 N4 C BI S1 S2 M2 K1 K2 K2 K3 X R Y C W G CN23 2 CN23 1 CN23 6 LIMIT CONTROL TRANSFORMER CONDENSING UNIT PRESSURE SW N O N C PS1 PS2 V1 CN23 3 CN23 5 COM ST912081005 ELECTRONIC FAN TIMER ROS MV PV MV PV MV MV PV PV 24V GNO GNO BURNER SPARK GAS VALVE HONEYWELL VR8204 PILOT 24V IGNITIO...

Reviews: