
2.2 Reinstalling the Printer
2.2.1 Installing the printer on the same floor
If ink has not been drained from the printer when moving it to another place on the
same floor, then an operation check (Test Print) needs to be performed after the
printer is moved to a new location.
2.2.2 Installing the printer on a different floor
If ink has been drained when transporting the printer to a different floor, follow the
installation procedure below. It is nearly identical to the procedure when installing for
the first time.
1) Unpack the printer, and mount the printer on a stand if a stand is included.
2) Remove the cushioning materials and tape.
3) Reattach the maintenance cartridge.
4) Remove the belt stopper.
5) Connect the power cord and ground wire.
6) Turn on the power and following the instruction in the message to install the ink
tank. The ink is filled.
7) Load the media, and perform the operation check.
3-9
W6200
Part 3: Operations
Summary of Contents for imagePROGRAF W6200
Page 2: ...1003 N 0 00 0 ...
Page 3: ......
Page 16: ...XII This page is intentionaly left blank ...
Page 121: ...Part 4 Technical Reference W6200 4 12 This page intentionally left blank ...
Page 267: ...5 99 W6200 Part 5 Maintenance This page intentionally left blank ...
Page 273: ...Part 5 Maintenance W6200 5 105 1 System Controller 2 15 F E D C B A 2 3 4 5 6 7 8 IC1 4 4 ...
Page 274: ...Part 5 Maintenance W6200 5 106 1 System Controller 3 15 F E D C B A 2 3 4 5 6 7 8 IC1 3 4 ...
Page 275: ...Part 5 Maintenance W6200 5 107 1 System Controller 4 15 F E D C B A 2 3 4 5 6 7 8 ...
Page 276: ...Part 5 Maintenance W6200 5 108 1 System Controller 5 15 F E D C B A 2 3 4 5 6 7 8 ...
Page 277: ...Part 5 Maintenance W6200 5 109 1 System Controller 6 15 F E D C B A 2 3 4 5 6 7 8 ...
Page 279: ...Part 5 Maintenance W6200 5 111 1 System Controller 8 15 F E D C B A 2 3 4 5 6 7 8 IC2 2 5 ...
Page 280: ...Part 5 Maintenance W6200 5 112 1 System Controller 9 15 F E D C B A 2 3 4 5 6 7 8 IC2 4 5 ...
Page 282: ...Part 5 Maintenance W6200 5 114 1 System Controller 11 15 F E D C B A 2 3 4 5 6 7 8 IC2 3 5 ...
Page 283: ...Part 5 Maintenance W6200 5 115 1 System Controller 12 15 F E D C B A 2 3 4 5 6 7 8 IC16 ...
Page 284: ...Part 5 Maintenance W6200 5 116 1 System Controller 13 15 F E D C B A 2 3 4 5 6 7 8 ...
Page 285: ...Part 5 Maintenance W6200 5 117 1 System Controller 14 15 F E D C B A 2 3 4 5 6 7 8 ...
Page 286: ...Part 5 Maintenance W6200 5 118 1 System Controller 15 15 F E D C B A 2 3 4 5 6 7 8 ...
Page 311: ...This document is printed on 100 recycled paper PRINTED IN JAPAN IMPRIME AU JAPON CANON INC ...