![Canature 105STS 90 -1.5](http://html1.mh-extra.com/html/canature/105sts-90-1-5/105sts-90-1-5_installation-operation-and-service-instructions_3864878048.webp)
Programming Section 8
Page 8-5
Screen Display During Regeneration Section 8.3
Filter display during regeneration
- The regeneration can be manually advanced by holding any button for three seconds
Main Menu Setup And Programming Section 8.4
- To access the programming screens, do the following:
- Push MENU to advance to the user menu screen and use the ARROWS to highlight Main
Menu.
- Push and HOLD the SET button for 5 seconds unit the controller beeps.
105 STS Control
Summary of Contents for 105STS 90 -1.5"
Page 1: ...105 Valve Installation Operation Service Instructions 105 Series STS Softener 80150418 1 31 19...
Page 2: ...105 Valve This page intentionally left blank...
Page 11: ...SPECIFICATIONS SECTION 2 Page 2 6 105 STS Softener 105 Valve Dimensions Section 2 5...
Page 35: ...Operation Section 7 Page 7 3 105 Softener Service Position...
Page 37: ...Operation Section 7 Page 7 5 105 Softener Backwash Position...
Page 39: ...Operation Section 7 Page 7 7 105 Softener Brine Draw Slow Rinse Position...
Page 42: ...Operation Section 7 Page 7 10 105 Softener Rinse Position...
Page 51: ...Programming Section 8 Page 8 8 Main Menu Setup And Programming Section 8 4 105 STS Control...
Page 52: ...Programming Section 8 Page 8 9 Main Menu Setup And Programming Section 8 4 105 STS Control...
Page 53: ...Programming Section 8 Page 8 10 Main Menu Setup And Programming Section 8 4 105 STS Control...
Page 54: ...Programming Section 8 Page 8 11 Main Menu Setup And Programming Section 8 4 105 STS Control...
Page 90: ...TROUBLE SHOOTING Section 11 Page 11 1 105 Valve Troubleshooting Section 11...
Page 91: ...TROUBLE SHOOTING Section 11 Page 11 2 105 STS Softener Valve Troubleshooting Section 11...