![Canature 105STS 90 -1.5](http://html1.mh-extra.com/html/canature/105sts-90-1-5/105sts-90-1-5_installation-operation-and-service-instructions_3864878043.webp)
Operation Section 7
Page 7 —11
105 Softener
Brine Tank Refill Section 7.7
The brine tank refill cycle will direct a predetermined amount of water back into the
brine tank for the next regeneration cycle. The refill water flows through the injector,
(aspirator), through the brine valve and out to the brine tank. The flow rate to the brine
tank is regulated by a flow control orifice. By adjusting the refill time, the volume of water
to the brine tank is fixed. This is position # 12 on the dial.
Summary of Contents for 105STS 90 -1.5"
Page 1: ...105 Valve Installation Operation Service Instructions 105 Series STS Softener 80150418 1 31 19...
Page 2: ...105 Valve This page intentionally left blank...
Page 11: ...SPECIFICATIONS SECTION 2 Page 2 6 105 STS Softener 105 Valve Dimensions Section 2 5...
Page 35: ...Operation Section 7 Page 7 3 105 Softener Service Position...
Page 37: ...Operation Section 7 Page 7 5 105 Softener Backwash Position...
Page 39: ...Operation Section 7 Page 7 7 105 Softener Brine Draw Slow Rinse Position...
Page 42: ...Operation Section 7 Page 7 10 105 Softener Rinse Position...
Page 51: ...Programming Section 8 Page 8 8 Main Menu Setup And Programming Section 8 4 105 STS Control...
Page 52: ...Programming Section 8 Page 8 9 Main Menu Setup And Programming Section 8 4 105 STS Control...
Page 53: ...Programming Section 8 Page 8 10 Main Menu Setup And Programming Section 8 4 105 STS Control...
Page 54: ...Programming Section 8 Page 8 11 Main Menu Setup And Programming Section 8 4 105 STS Control...
Page 90: ...TROUBLE SHOOTING Section 11 Page 11 1 105 Valve Troubleshooting Section 11...
Page 91: ...TROUBLE SHOOTING Section 11 Page 11 2 105 STS Softener Valve Troubleshooting Section 11...