PTP 820 Commissioning Log
The Commissioning Log is an integral part of the commissioning procedure and should be filled in
for each installed link.
The Commissioning Log gathers all relevant information regarding the installed link and contains a
checklist of all recommended commissioning tests.
Maintaining the Commissioning Log is important for tracking your installations, and to provide
essential data for Cambium Networks.
Upon completing the Commissioning Log, send the log to Cambium support center at
PTP 820 LINK COMMISSIONING LOG
1. GENERAL INFORMATION
Customer:
Radio model:
Configuration:
Radio link code:
Site 1 name & add:
Site 2 name & add:
2. RFU
Site 1
Site 2
RFU model:
RFU p/n:
RFU s/n:
RFU SW:
IDU model:
IDU p/n:
IDU s/n:
IDU SW:
Tx frequency (MHz):
Rx frequency (MHz):
Link ID:
Tx power (dBm):