background image

GB

Page 

6

CT,T, TP,  Rev22 - Operating Instructions

  It is forbidden to execute any operations with 

the direct use of hands. Use water-resistant, 

anti-cut gloves to disassemble and clean or in 

other particular cases.

i

 

 

During maintenance operations external

personnel is not allowed.

Maintenance operations that are not described in 

this manual must be made only by special personnel 

authorized by Calpeda S.p.A.

For further technical information regarding the use or 

the maintenance of the device, contact Calpeda S.p.A.

8.1. Routine maintenance

OFF

 

 

Before every maintenance operations 

disconnect the power supply and make sure 

that the device could not accidentally operate.

When the pump remains inactive it must be 

emptied completely if there is a risk of freezing.

Remove the front cover (12.00) or the drain plug 

(14.12), if available, to empty the pumps

of the T, TP series. To empty completely the CT pumps, 

remove the pump and turn it upside-down.

After a long idle period, before restarting the unit, 

check that the impeller is not jammed because of 

incrustations, settling solids (deposit formation) 

or other causes. If necessary clean with suitable 

action.

8.2. Dismantling the system

Close the suction and delivery gate valves and drain 

the pump casing before dismantling the pump.

8.3. Dismantling the pump

OFF

Close the suction and delivery gate valves before 

dismantling.

For dismantling and re-assembly see construction in 

the cross section drawing.

To remove the impeller (28.00) T, TP use the threaded 

dismantling holes.

9. DISPOSAL

OFF

The  final  disposal  of  the  device  must  be  done  by 

specialized company.

Make sure the specialized company follows the 

classification of the material parts for the separation. 

Observe the local regulations and dispose the device 

accordingly with the international rules for environment 

protection.

10.

 

SPARE PARTS

10.1. 

Spare-parts request

When  ordering  spare  parts,  please  quote  their 

designation, position number in the cross section 

drawing and rated data from the pump name plate 

(type, date and serial number).

The spare parts request shall be sent to CALPEDA 

S.p.A. by phone, fax, e-mail.

11.

  D

ESIGNATION OF PARTS

Nr. Designation

12.00 Casing cover

12.20 Screw

14.00 Pump casing

14.04 Plug (filling)

14.12 Plug (draining)

14.20 O-ring

14.24 Screw

28.00 Impeller

28.20 Impeller key

32.00 Lantern bracket

36.00 Mechanical seal

36.50 Shoulder ring

36.52 Shoulder ring

46.00 Deflector

70.00 Lantern bracket

70.18 Screw

73.00 Pump-side bearing

73.12 Circlip

76.00 Motor casing with winding

76.04 Cable gland

76.16 Support

76.54 Terminal box, set

78.00 Shaft with rotor packet

81.00 Fan-side bearing

81.08 Circlip

82.00 Motor end shield, fan side

82.04 Compensating spring

82.08 Screw

88.00 Motor fan

90.00 Fan cover

90.04 Screw

92.00 Tie-bolt

94.00 Capacitor

94.02 Capacitor gland

98.00 Terminal box cover

98.04 Screw

98.08 Gasket

99.00 Motor, complete

Changes reserved.

Summary of Contents for CT Series

Page 1: ...Page English P gina Espa ol...

Page 2: ...d section of the power cable chapter 6 5 The type of electrical protection to be installed chapter 6 5 1 1 Symbols To improve the understanding of the manual below are indicated the symbols used with...

Page 3: ...e of the device is forbidden as is use under conditions other than those indicated in these instructions Improper use of the product reduces the safety and the efficiency of the device Calpeda shall n...

Page 4: ...e technical catalogue 6 2 Ambient requirements and installation site dimensions The customer has to prepare the installation site in order to guarantee the right installation and in order to fulfill t...

Page 5: ...st starting OFF ATTENTION never run the pump dry Start the pump after filling it completely with liquid When the pump is located above the water level suction lift operation or with a positive suction...

Page 6: ...ves before dismantling For dismantling and re assembly see construction in the cross section drawing To remove the impeller 28 00 T TP use the threaded dismantling holes 9 DISPOSAL OFF The final dispo...

Page 7: ...ary replace it See point 2a also 4 Insufficient flow 4a Pipes and accessories with diameter too small causing excessive loss of head 4b Presence of deposits or solid bodies in the internal passages of...

Page 8: ...que se instalar el Cap tulo 6 5 1 1 S mbolos utilizados Para mejorar la comprensi n se utilizan los s mbolos pictogramas a continuaci n con sus significados Informaci n y advertencias que deben respet...

Page 9: ...ise ado y fabricado exclusivamente para el uso descrito en el p r 2 1 Est totalmente prohibida la utilizaci n del dispositivo para usos impropios y que no est n indicados en este manual El uso impropi...

Page 10: ...e ser golpeado Hay que evitar la superposici n al embalado de otro material que podr a da ar la bomba Si el peso supera los 25 Kg el embalado tiene que ser levantado por dos personas al mismo tiempo 6...

Page 11: ...s y para 220 240 50Hz con termoprotector incorporado 7 ARRANQUE Y USO 7 1 Controles antes del arranque La bomba no debe funcionar en presencia de parte deteriorada 7 2 Primer arranque OFF ATENCI N Evi...

Page 12: ...r que el rodete no esta bloqueado por incrustaciones o por otras causas Limpiar eventualmente con adecuada precauci n 8 2 Desmontaje del sistema Antes del desmontaje cierre las compuertas en aspiraci...

Page 13: ...aci n c Limpiar el filtro si es necesario sustituirlo Ver tambi n el punto 2a 4 Caudal insuficiente a Tuber a y accesorios con di metro demasiado peque o que provocan excesivas perdidas de carga b Pre...

Page 14: ...g and assembly Dibujo para desmontaje y montaje 98 04 46 00 28 00 76 00 14 00 14 04 28 20 76 04 94 00 76 54 98 00 82 00 88 00 82 04 82 08 81 00 81 08 78 00 73 12 73 00 36 00 14 20 36 52 36 50 90 00 14...

Page 15: ...00 92 00 46 00 70 18 36 50 14 12 12 20 81 00 82 04 94 02 76 04 94 00 76 54 98 00 98 08 14 00 98 04 70 00 14 04 82 00 90 00 88 00 3 94 112 28 20 28 00 12 00 14 20 3 94 114 14 00 14 24 14 24 32 00 14 1...

Page 16: ...40 2009 DECLARACION DE CONFORMIDAD En CALPEDA S p A declaramos bajo nuestra exclusiva responsabilidad que las Bombas CT T TP B I M modelo y numero de serie marcados en la placa de caracteristicas son...

Reviews: