30
Copyright© BYD Europe B.V. all rights reserved.
(2)
In battery side, arrange all power cables from cabinets and PDU
•
Lay the 3 power cables from cabinet1, to the installation points. According to Figure23.
•
Connecting the “S1P TO BATT+” Cable to Batt+ port in PDU.
•
Screw and torque with 18Nm and draw a mark with marker. See Figure25.
Figure24
Figure25
Figure23 Line Arranging-2
S1P TO BATT+
S2P TO QL1-3